My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-02-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:22 PM
Creation date
2/21/2013 7:24:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
2/20/2013
Doc Name
Response to Concrete Spec. and CDOT Inquiry.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pn <br />When Pn as shown at left is 3 to 9, or greater than 200, use <br />designated formula below to calculate Pay Factor, PF = ..., <br />when Pn is 10 to 200, use formula (1) above: <br />Maximum PF <br />3 <br />0.31177 <br />+ 1.57878 (QU100) - 0.84862 <br />(QU100) <br />1.025 <br />4 <br />0.27890 <br />+ 1.51471 (QU100) - 0.73553 <br />(QU100) <br />1.030 <br />5 <br />0.25529 <br />+ 1.48268 (QU100) - 0.67759 <br />(QU100) <br />1.030 <br />6 <br />0.19468 <br />+ 1.56729 (QU100) - 0 70239 <br />(QU100) <br />1.035 <br />7 <br />0.167p9 <br />+ 1.58245 (QU100) - 0.68705 <br />(QU100) <br />1.035 <br />8 <br />0.16394 <br />+ 1.55070 (QU100) - 0.65270 <br />(QU100) <br />1.040 <br />9 <br />0.11412 <br />+ 1.63532 (QU100) - 0.68786 <br />(QU100) <br />1.040 <br />10 to 11 <br />0.15344 <br />+ 1.50104 (QU100) - 0.58896 <br />(QU100) <br />1.045 <br />12 to 14 <br />0.07278 <br />+ 1.64285 (QU100) - 0.65033 <br />(QU100) <br />1.045 <br />15 to 18 <br />0.07826 <br />+ 1.55649 (QU100) - 0.56616 <br />(QU100) <br />1.050 <br />19 to 25 <br />0.09907 <br />+ 1.43088 (QU100) - 0.45550 <br />(QU100) <br />1.050 <br />26 to 37 <br />0.07373 <br />+ 1.41851 (QU100) - 0.41777 <br />(QU100) <br />1.055 <br />38 to 69 <br />0.10586 <br />+ 1.26473 (QU100) - 0.29660 <br />(QU100) <br />1.055 <br />70 to 200 <br />0.21611 <br />+ 0.86111 (QL /100) <br />1.060 <br />> 20i <br />0.15221 <br />+ 0.92171 (QU100) <br />1.060 <br />CC &V PROJECT NO. SC -07 -002 <br />Process I /DP Computation. <br />I /DP = (PF - 1)(QR)(UP)(W /100) <br />Where: TonHMA <br />UPHMA <br />TonAc <br />U P <br />4 <br />REVISION OF SECTIONS 105 AND 106 <br />CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT <br />(LESS THAN 5000 TONS) <br />Table 105 -3 <br />FORMULAS FOR CALCULATING PF BASED ON PN <br />February 3, 2011 <br />Where: I /DP = Incentive /Disincentive Payment <br />PF = Pay Factor <br />QR = Quantity in Tons of HMA Represented by the Process <br />UP = Unit Bid Price of Asphalt Mix <br />W = Element Factor from Table 105 -2 <br />When AC is paid for separately UP shall be: <br />UP = [(TOnHMA)(UPHMA) + (TOnAC)(UPAC)]/TOnHMA <br />= Tons of Asphalt Mix <br />Unit Bid Price of Asphalt Mix <br />= Tons of Asphalt Cement <br />= Unit Bid Price of Asphalt Cement <br />
The URL can be used to link to this page
Your browser does not support the video tag.