My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-02-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:22 PM
Creation date
2/21/2013 7:24:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
2/20/2013
Doc Name
Response to Concrete Spec. and CDOT Inquiry.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC &V PROJECT NO. SC -07 -002 <br />2 <br />REVISION OF SECTIONS 105 AND 106 <br />CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT <br />(LESS THAN 5000 TONS) <br />If the test result is within the tolerance limits then PF = 1.00 <br />If the test result is above the maximum specified limit, then <br />PF = 1.00 â [0.25(T - T <br />If the test result is below the minimum specified limit, then <br />PF = 1.00 â [0.25(T - T <br />Where: PF = pay factor. <br />V = V factor from Table 105 -2. <br />T = the individual test result. <br />T = upper specification limit. <br />T = lower specification limit. <br />The calculated PF will be used to determine the I /DP for the process. <br />February 3, 2011 <br />(b) Determining Quality Level. Each process with three or more test results will be evaluated for a quality level <br />(QL) in accordance with Colorado Procedure 71. <br />(c) Gradation Element. Each specified sieve, with the exception of 100 percent passing sieves, will be evaluated <br />for QL separately. The lowest calculated QL for a sieve will be designated as the QL for gradation element <br />for the process. <br />(d) Joint Density Element. Joint Density will be tested according to subsection 401.17. <br />(e) Process Pay Factor. Using the calculated QL for the process, compute PF as follows: The final number of <br />random samples (Pn) in each process will determine the final pay factor. . As test values are accumulated <br />for each process, Pn will change accordingly. When the process has been completed, the number of random <br />samples it contains will determine the computation of PF, based on Table 105 -3 and formula (1) below. <br />When Pn is from 3 to 9, or greater than 200, PF will be computed using the formulas designated in Table 105- <br />3. Where Pn is equal to or greater than 10 and less than 201, PF will be computed by formula (1): <br />(PF, + PF r (PF + PF (PF1 + PF (Pn â Pn <br />(1) PF = + <br />2 L x <br />2 2 (Pn âPn <br />Where, when referring to Table 105 -3: <br />PF PF determined at the next lowest Pn formula using process QL <br />PF PF determined using the Pn formula shown for the process QL <br />PF PF determined at the next highest Pn formula using process QL <br />Pn the lowest Pn in the spread of values listed for the process Pn formula <br />Pn the lowest Pn in the spread of values listed for the next highest Pn formula <br />Pn the actual number of test values in the process <br />When evaluating the item of Furnish Hot mix asphalt, the PF for the element of In -Place Density shall be 1.0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.