Snowcap Coal Company, Inc. <br />-10- 2012 Annual Reclamation Report <br />West, 6 P.M. <br />Area - 2.9 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14 -13 ", Upland Components <br />26. Conveyor Corridor - The conveyor corridor, from the Xcel culvert <br />north to Haul Road #3 was graded to approximate original <br />contours and reseed. A total of 0.5 acres in this area achieved <br />final Phase III Bond Release with SL -5, approved on November 5, <br />2009 and the remaining 2.2 acres achieved final Phase III Bond <br />Release with SL -7, approved on April 26, 2011. Located in SEY4, <br />Section 27 and NW' /4, Section 34, Township 10 South, Range 98 <br />West, 6 P.M. <br />Area - 2.7 acres <br />Date - July 2003 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase Ill Bond Release - 2.7 acres <br />27. Conveyor Corridor - The conveyor corridor, from the Xcel culvert <br />south to Transfer Building #2 and east of Colorado River where <br />conveyor tube crossed river was graded to approximate original <br />contours and seeded. A total of 1.3 acres in this area achieved <br />final Phase Ill Bond Release with SL -5, approved on November 5, <br />2009. Located in SEA, Section 27 and NW' /4, Section 34, Township <br />10 South, Range 98 West, 6 P.M. <br />Area - 1.6 acres <br />Date - March 2004 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase III Bond Release - 1.3 acres <br />28. Substations A - Superstructures, fences, slabs and components <br />removed during 2007. Graded to approximate original contours <br />and re- seeded. Located in the SE% Section 34, Township 10 <br />South, Range 98 West, 6 P.M. <br />Area - 0.2 acres <br />Date - August 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />29. Roadside South Portal Mine Facilities and Stockpile /Prep Plant <br />Area and Conveyor Tunnel Under 1 -70 - The Roadside South <br />Portal Mine Facilities, Stockpile and Prep Plant areas where <br />reclaimed as per approved Permit Revision #3 (PR -3). 13.5 acres <br />were reclaimed during the last two quarters of 2007. These acres <br />include all back filled and graded areas along with buildings and <br />asphalt areas that were approved for retention through PR -3. The <br />east end of the Conveyor Tunnel was backfilled and filled with a 2 <br />foot concrete plug. Due to inclement weather and frozen soils, <br />