My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-30_REPORT - C1981041 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2013-01-30_REPORT - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:32 PM
Creation date
1/31/2013 7:46:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REPORT
Doc Date
1/30/2013
Doc Name
2012 Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />-11- 2012 Annual Reclamation Report <br />seeding was postponed until the 1 quarter of 2008. These 13.5 <br />acres achieved final Phase III Bond Release with SL -6 which was <br />approved on December 14, 2010. Located in the SW% & SEY4 <br />Section 34, Township 10 South, Range 98 West, 6 P.M. <br />Area - 13.5 acres reclaimed <br />9.6 acres backfilled and graded <br />6.4 acres top soiled <br />Date - December 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />Phase III Bond Release - 13.5 acres <br />Pond 8 and surrounding area was backfilled, graded to final <br />contours and seeded in 2011. Located in the SWY4 & SEY4 Section <br />34, Township 10 South, Range 98 West, 6 P.M. <br />Area - 0.5 acres <br />Date - October 2011 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />30. Roadside South Portal Road to Old Upper Diversion Ditch and <br />Water Tank (Light Use Road #1) - Portions of Light Use Road #1, <br />as approved by PR -3, was graded to approximate original contours <br />and seeded. Located in the SEY4 Section 34, Township 10 South, <br />Range 98 West, 6 P.M. <br />Area - 1.9 acres <br />Date - September 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />31. Railroad Loop Track (South of 1 9/10 Road) - The Railroad Loop <br />Track that lies south of 1 9/10 Road was removed, regraded, <br />backfilled and seeded. This area was part of the 2.1 acres that <br />achieved final Phase III Bond Release with SL -5, approved on <br />November 5, 2009. Located in the NW Section 34, Township 10 <br />South, Range 98 West, 6 P.M. <br />Area - 0.3 acres <br />Date - January 2009 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase Ill Bond Release - 0.3 acres <br />32. Cameo Refuse Disposal Area No. 1 (Road) - The "access" road <br />(1.2 acres) to Cameo Refuse Disposal Area No. 1 that had been <br />left open for coal fines clean up was regraded and backfilled to <br />approved final contours and seeded. Located in the SE% Section <br />28, Township 10 South, Range 98 West, 6 P.M. <br />Area - 1.2 Acres <br />Date - September 2010 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />
The URL can be used to link to this page
Your browser does not support the video tag.