Laserfiche WebLink
6 . DISTURBANCES <br /> Five mining and reclamation phase maps depicting the <br /> status of lands within the Climax property have been developed <br /> in a sequential time order and entered in Appendix I and at the <br /> end of Section 6 . Phase I has lapsed . Phase II through Phase <br /> III maps illustrate the changes that have and will occur in <br /> land status of 36 disturbance sites until the approximate year <br /> 2030 . Disturbed sites are labeled on maps and referred to with <br /> numerals, ( 1) through ( 36 ) . Land status is symbolized on the <br /> maps to indicate affected , or under the process of reclamation. <br /> Sites under the process of reclamation remain legally affected . <br /> Correlated with the phase maps is a timetable , (Table <br /> 6 .1 ) , which indicates for each disturbed site the changes in <br /> land status acreage from one phase to the next. Since <br /> disturbances and reclamation are on-going processes throughout <br /> all phases , acreages listed for each site are indicative of its <br /> land status existing at the end of each phase . <br /> 6 . 2 AFFECTED LANDS <br /> Climax submits a total of 7671 acres of affected <br /> lands for purposes of bonding during 1981 �ofYPhase II of the <br /> mining and reclamation plan. <br /> Most of the major disturbances associated with all <br /> phases of the mining plan have been referred to in Section 2, <br /> Project Description/Mining Plan. Each numerated area of <br /> presently affected land is described or referenced in the <br /> following paragraphs. <br /> Area ( 1 ) includes the Open Pit operation (pit, haul <br /> roads and stockpiles) , in conjunction with subsidence from <br /> underground mining , and currently affects approximately 1154 <br /> acres. Directly associated with the Open Pit operations are <br /> the Cirque Dump ( 2 ) and McNulty Dump ( 6 ) , "which have respective <br /> acreages of 133 and 368 acres at this time . The Low Grade Ore <br /> Stockpile ( 12 ) currently affects 199 acres . Service corridors <br /> ( 8 , 10 , 16 , 17 , 20 , 25 , 26 . 28 ) for tailing delivery lines, <br /> domestic and millwater lines, interceptor canals , gas lines, <br /> 6-1 <br />