Laserfiche WebLink
10 . 19 BUFFER ( 11 ) <br /> Revegetation will occur in the buffer. ( 11 ). as required <br /> by the type of disturbance. Presently, well established veget- <br /> ation requires no special management. If final reclamation is <br /> needed , then at a minimum, it will consist of grading , hydro- <br /> seeding , fertilizing and hydromulching . <br /> 10. 20 BASE OF LOW GRADE ORE STOCKPILE ( 12 ) <br /> An old tailing pond was deactivated at Climax during <br /> 1936 at which time tailing deposition commenced in the Robinson <br /> Tailing Pond . Now the old tailing pond is being covered with open <br /> pit waste rock as a base upon which to store low grade ore. One <br /> hundred ninety-nine acres will be covered. <br /> The base or lower bench of waste rock will be about 80 <br /> feet in width to allow for a tailing delivery line , service road <br /> and equipment access for reclamation purposes. The bank slope <br /> will have about a 1 . 3: 1 ratio. <br /> During Phase III this bench and slope of waste rock <br /> along Highway 91 will be revegetated with the aide of topsoil from <br /> McNulty Gulch. The procedure will be similar to that described <br /> for lower. McNulty Waste Rock Dump. <br /> Following final processing of the low grade ore which <br /> was stockpiled on top of the waste rock, reclamation of the <br /> surface of the waste rock base will commence . Reclamation <br /> procedures will be similar to that described for the bench <br /> surfaces in the mid section (Section 2 ) of McNulty Waste Rock <br /> Dump. Grading and any reshaping of the waste rock will easily <br /> occur on the large surface area of the dump. Topsoil will not be <br /> available for the reclamation effort. <br /> 10 . 21 ROBINSON TAILING POND ( 13 ) AND DAMS NO. 1 AND NO. 2 ( 14 , 15 ) <br /> Portions of the Robinson tailing deposition area are <br /> scheduled to be stablized and r.evegetated during Phase III and <br /> Phase VI . Stabilization will likely commence on the 140 acres of <br /> No. 1 Dam ( 14 ) during the period 1990 to 1992 following the <br /> deactivation of tailing deposition on Robinson and will involve <br /> 10-17 <br />