Laserfiche WebLink
• Construction Drawings - draft construction drawings prepared i <br />accordance with Henderson specifications. <br />• Technical Specifications - draft bid schedule and technic :I <br />specifications prepared in a format specified by the Henderson Mill. <br />URS will provide recommendations as to the extent of construction work that can b! <br />cost - effectively included in the Phase I extraction well system project considering th <br />Henderson Mill's budget. <br />Step 2: After incorporation of comments from the Henderson Mill, URS will prepay: <br />one original set and six copies of the final plans and specifications. This submittEt <br />will have the following level of detail: <br />• Construction Drawings - final construction drawings prepared for <br />bidding purposes, which incorporate review comments. The drawing; <br />will be stamped and signed by a professional engineer registered in the <br />State of Colorado. <br />• Technical Specifications - final bid schedule and technics I <br />specifications, which incorporate review comments. <br />Task 6 - Bidding Support and Construction Management <br />• Purpose: Assist the Henderson Mill as needed with bidding and construction of <br />Phase I of the project. <br />• Scope: URS assumes that the following services will be provided during bidding: <br />• Attend one pre -bid meeting; <br />• Prepare an Addendum to the contract documents; and <br />• Evaluate bids and assist with contractor selection. <br />URS assumes that it will provide limited on -site construction management service; <br />during installation of each well. URS will direct well development and short -terns <br />pumping test activities, and collect data during testing. URS will also attend one pre - <br />construction meeting as part of this task. Construction management services durin;; <br />pipeline installation will be provided on an as- needed basis and are not included in <br />this proposal. <br />