2013-01-15_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2013-01-15_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:07 PM
Creation date
1/16/2013 6:50:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
1/15/2013
Doc Name
Submittal of Constr. Cert. and As-Built Drawings for 1-Dam Wellfield.
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• Deliverable: URS will provide a brief report that summarizes construction activities. <br />provides as -built drawings of the wells and pipeline, and presents analysis of short <br />term well test data. <br />Task 7 — Start -Up and Pilot Testing of Phase I Extraction Well System <br />• Purpose: To evaluate the effectiveness of the Phase 1 extraction well system an(' <br />determine whether more wells (Phase I1) are needed for seepage capture. <br />• Scope: Provide assistance to the Henderson Mill for extraction well system start -up. <br />monitor performance, and resolve any initial operational problems. URS will also <br />conduct a long -term (2 to 4 weeks) pumping test of the Phase I well system, collec <br />data during pilot testing, and evaluate the degree of seepage capture. After completion <br />of the pilot test, URS will provide recommendations regarding the need for additional <br />(Phase II) wells as well as scope and costs of long -term monitoring. <br />• Deliverable: URS will prepare a report presenting water level monitoring data, ;I <br />capture zone analysis, and analysis of the system's performance. 11 pilot test darn <br />indicate that the system is not achieving capture, recommendations would bi. <br />provided regarding the need for additional wells and their placement. <br />SCHEDULE <br />We anticipate that Phase I can be completed by the end of September 2001 Test hob. <br />drilling/piezometer installation is tentatively scheduled to begin the week of May 28 <br />REFERENCES <br />URS Corporation, 2001. Feasibility Study of Groundwater Extraction Well System for Seepag4 <br />Control at Henderson Mill Tailing Impoundment, Confidential Technical Memorandum <br />to Phelps Dodge Henderson Mill. <br />• • • <br />