My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-15_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2013-01-15_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:07 PM
Creation date
1/16/2013 6:50:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
1/15/2013
Doc Name
Submittal of Constr. Cert. and As-Built Drawings for 1-Dam Wellfield.
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
adapters), outflow structure(s), and flow measurement devices. Design drawings will <br />include section and plan views as well as appropriate design details, and will b•: <br />presented in the Design Report (Task 5). <br />Task 4 — Design Electrical Power System and Controls <br />• Purpose: Develop an adaptable and expandable design for the extraction well system <br />electrical power supply and controls. The electrical power supply must be capable o; <br />powering up to seventeen, 240v, 0.5 hp, 10 amp submersible pumps utilizing 240x, 3 <br />phase power. In addition, the well pumps will be equipped with electronic wate- <br />level sensor controls to prevent pump cavitation and optimize system operation. <br />• Scope: Prepare a site electrical power supply plan that will utilize the existing powe <br />service available at the Ute Park pump station (480v, 3- phase), convert it to thy• <br />appropriate voltage, and distribute it to the well pumps over a distance cr <br />approximately 1,100 feet. A control system will also be designed to automate <br />operation of the well pumps and provide flow metering. <br />• Deliverable: The deliverable will consist of design drawings of the electrical powe • <br />supply and distribution system, electrical connections to the well pumps, electronic <br />water level sensors, and automated flow metering. Design drawings will be presented <br />in the Design Report (Task 5). <br />Task 5 — Prepare Design Report, Plans and Specifications <br />• Purpose: Provide the Henderson Mill with a detailed and comprehensive desigt, <br />report, plans, and specifications for bidding and construction of the extraction well <br />system, pumps, transmission pipeline, electrical power supply, and controls. <br />• Scope: URS will prepare a design report that incorporates the work products front <br />Tasks 1 through 4, and presents findings and design drawings. URS will also prepare: <br />draft and final versions of the plans and specifications for bidding and construction o <br />the system. <br />• Deliverable: The plans and specifications for the extraction well system will be <br />prepared in two steps. Step l: URS will prepare a draft version of the plans and <br />specifications and submit them to the Henderson Mill for review and comment. This: <br />submittal will have the following level of detail: <br />
The URL can be used to link to this page
Your browser does not support the video tag.