Laserfiche WebLink
1.4 Certification Boundary <br />Figure 1 presents the boundary of the areas being certified in this report. The work completed <br />within the certification boundary included site grading; subgrade preparation; BF installation, <br />placement and compaction; installation of Bentomat ST GCL; installation of 80 -mil single sided <br />texture LLDPE geomembrane; and BF placement above the geomembrane, where required to <br />project specifications. <br />4 <br />