My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/10/2013 9:54:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Monitoring and Test Results- LOB Liner Extension- Cover to Append. G.1
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alk <br />�i <br />WTI I <br />■ Observation and documentation of GCL and geomembrane deployment, trial seams, <br />seaming, destructive testing, and non - destructive testing (pressure tests and vacuum <br />tests); <br />■ Observation and documentation of GCL seaming performed in accordance with the <br />manufactures recommendations; <br />■ Performing conformance testing of geomembrane; <br />■ Measuring geomembrane panel thickness and confirming adequate GCL and <br />geomembrane panel overlap; <br />■ Visually inspecting GCL and geomembrane sheet quality, seam alignment, and <br />continuity; and <br />■ Retaining archive samples of geomembrane destructive tests and trial seams. <br />1.3 Project Coordination <br />AMEC CQC and CQA activities were directed by the AMEC Resident Engineer. The AMEC <br />Resident Engineer for the period was Mr. Joseph D. Hickey. The Certifying Engineer and <br />Project Manager, Mr. Jay Janney- Moore, P.E., or his representative made periodic site visits to <br />resolve technical issues and to review AMEC activities. Appendix C presents a summary of the <br />AMEC staff on -site during the period of October 10th -12th, 2011. <br />Representatives of CC &V, Ames, Foresight West (QA Surveyor), and AMEC conducted daily <br />preconstruction coordination meetings throughout the construction period. <br />1.3.1 Daily Construction Summary Reports <br />AMEC prepared daily construction summary reports, and have been submitted to CC &V, as well <br />as photographic documentation (Appendix B) throughout the project to document the key <br />elements of construction and the CQA activities that occurred. On -site AMEC CQA personnel, <br />and the Certifying Engineer and the Project Engineers discussed construction activities on a <br />regular basis. A schedule of the AMEC staff for the duration of the installation can be found <br />in Appendix C. <br />1.3.2 Project Specifications <br />All work was performed in accordance with the design plans and specifications in Amendment <br />Nos. 8 and 9 to Mining Permit M- 1980 -244. <br />
The URL can be used to link to this page
Your browser does not support the video tag.