My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/10/2013 9:54:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Monitoring and Test Results- LOB Liner Extension- Cover to Append. G.1
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pff1/ /lr's ' <br />summarized in Table 1. CQC earthworks testing was provided to support the contractor during <br />the manufacture of materials Bedding Fill (BF) and prior to material placement. <br />AMEC provided CQA laboratory and field testing, and monitored earthworks construction <br />activities as follows: <br />AMEC monitored site excavation and grading, including slope re- contouring and fill <br />placement, lift thickness, moisture conditioning, temperatures, and compactive effort. <br />AMEC visually monitored subgrade preparation to confirm that the subgrade surface <br />was unyielding, free of organic matter and other unsuitable materials, and that the <br />subgrade surface was compacted prior to BF placement. <br />AMEC visually monitored the placement and compaction of BF, particle size, moisture <br />conditioning, and compaction of the fill. AMEC performed in -place density and moisture <br />content testing, and performed CQA laboratory testing of grain size, moisture content, <br />Atterberg limits, and compaction. AMEC also provided visual monitoring of the BF <br />surface preparation and moisture conditioning for geosynthetic clay liner (GCL) <br />deployment, including verification that the surface was proof - rolled, compacted, and <br />hand - worked so as to be free of abrupt grade changes, and sharp stones or objects. <br />AMEC also observed the excavation, backfill, and compaction of the anchor trenches. <br />AMEC visually monitored the placement of BF above the installed geomembrane, <br />including verification of lift thickness and grade control, identification and removal of <br />deleterious materials, and verification that care was exercised in fill placement to avoid <br />geomembrane damage. AMEC performed CQA laboratory testing of grain size and <br />Atterberg limits. <br />AMEC monitored the ambient air temperatures and the temperatures of all fills, including <br />BF, in accordance with project specifications. <br />1.2.2 CQA/CQC Monitoring of Geosynthetics Installation <br />AMEC provided CQA monitoring of geosynthetics used for the LOB Liner Extension. CQC <br />services provided by AMEC consisted of performing geosynthetics inventory and checking <br />quality control certifications prior to geosynthetics deployment. AMEC performed geosynthetics <br />CQA activities in accordance with the CQA Plan. Geosynthetics CQA activities performed by <br />AMEC included: <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.