Laserfiche WebLink
ameO <br />2.0 SUMMARY OF EARTHWORK CONSTRUCTION <br />Earthworks activities associated with the LOB Liner Extension included the following: <br />■ Site excavation and reshaping per the drawings; <br />• BF placement and compaction, and preparation of BF surface for GCL deployment; <br />■ acceptance of the installed GCL prior to geomembrane deployment; <br />■ 80 -mil LLDPE single sided texture deployment and acceptance <br />■ BF placement above the geomembrane layer; and <br />■ re- placement of SF to finish grade per the drawings <br />Ames generally used the following equipment during construction: <br />• Caterpillar D6 LGP Dozer; <br />■ Caterpillar 988 Loader; <br />■ John Deere 544 Loader; <br />■ Caterpillar 777 Haul Trucks; <br />■ Caterpillar 740 Haul Trucks; <br />■ Caterpillar CS563 Compactor; <br />■ Caterpillar 312 Trackhoe ; <br />■ Caterpillar 330 Trackhoe <br />• Caterpillar 385 Trackhoe; <br />• John Deere 850 Trackhoe; <br />• Bobcat Skid Steer Loader; and <br />■ Tandem -axle Water Truck <br />Table 2 presents a summary of the weather during the period of October 10th through October <br />12th 2011 for the construction activities. <br />5 <br />