Laserfiche WebLink
Table of Contents (Continued) <br />Appendix G.2 Geomembrane Trial Seam Summaries <br />Appendix G.3 Geomembrane Fusion Welding Summary <br />Appendix GA Geomembrane Defect/Repair Summary <br />Appendix G.5 Geomembrane Destructive Testing Summaries <br />Appendix G.6 Geomembrane Non - Destructive Testing Summaries <br />Appendix G.7 Geomembrane and GCL Acceptance Notification <br />Appendix J Conformance Test Results <br />Appendix K Tensiometer Certification <br />ACRONYMS <br />ASTM <br />American Society for Testing and Materials <br />BF <br />Bedding Fill <br />CC &V <br />Cripple Creek & Victor Gold Mining Company <br />CP <br />Concrete Plug <br />CQA <br />Construction Quality Assurance <br />CQC <br />Construction Quality Control <br />DRMS <br />Division of Reclamation, Mining and Safety <br />FSB <br />Fine Shaft Backfill <br />FTB <br />Film Tear Bond <br />GCL <br />Geosynthetic Clay Liner <br />IFC <br />Issued for Construction <br />LLDPE <br />Linear Low Density Polyethylene <br />LOB <br />Load Out Bin <br />MLRB <br />Mined Land Reclamation Board <br />SF <br />Structural Fill <br />VLF <br />Valley Leach Facility <br />ameO <br />iv <br />