Laserfiche WebLink
List of Tables <br />Table 1 Summary of Earthworks Material Specifications <br />Table 2 Summary of Weather Data <br />Table 3 Fill Temperature Monitoring Summary <br />Table 4 Earthworks CQA Test Summary and Testing Frequency <br />Table 5 LOB Liner Extension Bedding Fill Laboratory Testing Summary <br />Table 6 LOB Liner Extension Nuclear Density Laboratory Testing Summary <br />List of Figures <br />Figure 1 LOB Liner Extension Boundary <br />Figure 2 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />Figure 3 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />List of IFC Drawings <br />A100 LOB Liner Extension Existing Conditions and Proposed Final Grading <br />A105 LOB Liner Extension Proposed Excavation Plan, Isopach and Control Points <br />A110 LOB Liner Extension Sections and Details <br />List of Appendices <br />Appendix A Geomembrane As -Built Drawing <br />Appendix B Photographic Documentation <br />Appendix B.1 Photograph Log <br />Appendix B.2 Documentary Photographs <br />Appendix C Staff Schedule for Personnel <br />Appendix D Subgrade Acceptance Forms <br />Appendix E CQA Laboratory Test Results <br />Appendix E.1 Grain Size Distribution, Moisture Content and Atterberg Limits <br />Appendix E.2 Compaction Tests <br />Appendix F Geomembrane Quality Control Documents and Inventory <br />Appendix F.1 Geomembrane and GCL Inventory Control <br />Appendix F.2 Resumes of Installation Personnel <br />Appendix F.3 Geomembrane Resin Quality Control Certificates <br />Appendix F.4 Geomembrane Roll Quality Control Certificates <br />Appendix F.5 Welding Rod Quality Control Certificates <br />Appendix F.6 GCL Certified Properties <br />Appendix G Geomembrane Installation Observations <br />Appendix G.1 Geomembrane Deployment Observations <br />