My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (13)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 2:35:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Append. E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame9 <br />• preconstruction coordination with the CQA Monitor to ensure that the CQA Monitor has <br />performed similar reviews of the design DRAWINGS and project SPECIFICATIONS to <br />ensure that the CQA Plan can be implemented; <br />• coordination of all construction activities associated with the various CONTRACTOR(S); <br />• scheduling and coordinating construction activities with required CQA testing and activities; <br />• overseeing the construction quality control operations performed by the CONTRACTOR(S); <br />• approve specific corrective measures to be implemented during construction when deviations <br />from the SPECIFICATIONS occur; <br />• ensure that required quality control testing has been performed in accordance with the CQA <br />Plan and to the satisfaction of the CQA Monitor; and <br />• ensure that the CQA personnel are provided with all documentation required in the CQA Plan <br />and project SPECIFICATIONS. <br />2.03 DESIGN ENGINEER: <br />In this CQA Plan the DESIGN ENGINEER refers specifically to AMEC. The DESIGN ENGINEER is <br />the individual or firm responsible for the design and preparation of the project construction DRAWINGS <br />and project SPECIFICATIONS. The DESIGN ENGINEER is responsible for approving all design and <br />project SPECIFICATION changes, modifications, or clarifications encountered during construction. <br />2.04 CERTIFYING ENGINEER: <br />In this plan, CERTIFYING ENGINEER refers specifically to AMEC. CERTIFYING ENGINEER is <br />the individual or firm responsible for certifying the construction was performed in compliance with the <br />DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING ENGINEER will be responsible <br />for the resolution of all quality assurance issues. <br />2.05 CONSTRUCTION QUALITY ASSURANCE MONITOR: <br />The Construction Quality Assurance Monitor, also referred to as the "CQA Monitor ", is the firm or <br />individual responsible for performing the CQA tasks outlined in this plan. The CQA Monitor is the official <br />CQA representative of CC &V and has the responsibility of overseeing the CQA aspects of the project. In <br />this CQA Plan the CQA Monitor is associated with the CERTIFYING ENGINEER and refers <br />specifically to AMEC. The CQA Monitor has the authority to stop any aspect of the work that is not in <br />compliance with the CQA Plan. Work would then be resumed once corrective action has been approved <br />by the MANAGER and CERTIFYING ENGINEER. The specific responsibilities of the CQA Monitor <br />include: <br />• review the design DRAWINGS, project SPECIFICATIONS, and related guidance <br />documents; <br />• review all CONTRACTOR QC submittals and make appropriate recommendations; <br />• observe geosynthetic material delivery, unloading, and storage; <br />• obtain and test geosynthetic conformance samples during geosynthetics manufacture; <br />Section 01400.2 Page 2 of 11 <br />Geosynthetic CQA Plan <br />June 19, 2012 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.