My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (13)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 2:35:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Append. E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• observe prepared subgrade prior to geosynthetic deployment; <br />• monitor and document geosynthetic material placement, trial seam testing, non - destructive <br />testing, seaming and repair operations, and destructive testing; <br />identify seam samples for CQA destructive testing; <br />assure that testing equipment used, and tests performed are conducted according to project <br />SPECIFICATIONS and industry standards; <br />perform or observe, document, and report test results to MANAGER as required; <br />• report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br />Monitor, including design or project SPECIFICATION changes; and <br />• prepare a Construction Certification Report describing the construction, any deviations from <br />SPECIFICATIONS or, DRAWINGS and details, details of all field and laboratory details, <br />subgrade acceptance forms, test data, tests results (both laboratory and field), QC submittals, <br />geomembrane panel layout as -built prepared by the CQA Monitor, professional certification <br />that construction was completed in compliance with the DRAWINGS and <br />SPECIFICATIONS. The report will be signed and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />2.06 GEOSYNTHETICS MANUFACTURER: <br />The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER ", is responsible for <br />production of the geosynthetic components outlined in this plan. Each MANUFACTURER must verify <br />prior to construction that the MANUFACTURER can produce material that meets the requirements <br />outlined in project SPECIFICATIONS. <br />2.07 GEOSYNTHETICS INSTALLATION CONTRACTOR: <br />The Geosynthetics Installation Contractor, also referred to as the "CONTRACTOR" or "INSTALLER ", <br />is responsible for installation of the geosynthetic components, as outlined in the project <br />SPECIFICATIONS. <br />The INSTALLER must meet the requirements outlined in the project SPECIFICATIONS. <br />The INSTALLER will be responsible for storage, handling, deploying, temporary geomembrane <br />anchoring, seaming, repairs and non - destructive testing, in accordance with the project plans, <br />SPECIFICATIONS and the INSTALLER's internal quality control program. It is the INSTALLER's <br />responsibility to see that all submittals are received as outlined in the project SPECIFICATIONS. <br />2.08 EARTHWORKS CONTRACTOR: <br />amec <br />The Earthworks Contractor, also referred to as "CONTRACTOR" is responsible for proper delivery and <br />placement of earthwork components as outlined in the project SPECIFICATIONS. <br />Section 01400.2 Page 3 of 11 June 19, 2012 <br />Geosynthetic CQA Plan Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.