My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-14_INSPECTION - M1992016
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1992016
>
2012-12-14_INSPECTION - M1992016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:23 PM
Creation date
12/17/2012 3:11:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992016
IBM Index Class Name
INSPECTION
Doc Date
12/14/2012
Doc Name
INSPECTION REPORT
From
DRMS
To
OPERATOR
Inspection Date
6/4/2012
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />(%) <br />(%) <br />(min) <br />1 <br />1000.00 <br />0.50 <br />5.00 <br />5.50 <br />1098 <br />0.98 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />(%) <br />(T) <br />(%) <br />( <br />1 <br />1000.00 <br />-0.50 <br />5.00 <br />4.50 <br />2562 <br />0.66 <br />Scraper Worksheet Cont'd Task # 001 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Return Route: <br />Net Correction: <br />0.830 <br />NA <br />0.90 Minutes <br />0.70 Minutes <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Haul Time: <br />Return Time: <br />Total Scraper team cycle time: 3.24 minutes <br />Adjusted for job conditions: 315.09 LCY/Hour <br />Selected Number of Scrapers: 1 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 315.09 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 315.09 LCY/Hour <br />Unadjusted unit production/hour: 379.63 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 37.85 Hours <br />Unit cost: $0.629 /LCY Total job cost: $7,505.62 <br />Site Altitude: 5300 feet <br />0.98 minutes <br />0.66 minutes <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # 001 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Return Route: <br />Net Correction: <br />0.830 <br />NA <br />0.90 Minutes <br />0.70 Minutes <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Haul Time: <br />Return Time: <br />Total Scraper team cycle time: 3.24 minutes <br />Adjusted for job conditions: 315.09 LCY/Hour <br />Selected Number of Scrapers: 1 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 315.09 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 315.09 LCY/Hour <br />Unadjusted unit production/hour: 379.63 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 37.85 Hours <br />Unit cost: $0.629 /LCY Total job cost: $7,505.62 <br />Site Altitude: 5300 feet <br />0.98 minutes <br />0.66 minutes <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.