Laserfiche WebLink
Task description: <br />Site: Penrose Ranch's <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />002 <br />12/10/2012 <br />TC1 <br />Agency or organization name: DRMS <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Cat D6T LGP <br />200 <br />Straight <br />NA <br />1 per day <br />(CRG) <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />5,300 <br />1.000 <br />5,300 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Create 3:1 slopes with backfill material <br />$156.32 <br />$156.32 <br />State: Colorado <br />County: Fremont <br />$49.25 <br />$68.58 <br />$0.00 <br />$38.49 <br />Division of Reclamation, Mining & Safety <br />50 feet <br />444.6 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: 25 % <br />Average site altitude: 5,300 feet <br />Material weight: 2,6501bs/LCY <br />BULLDOZER WORK <br />Permit Action: 2003 AMO2 Unit Cost <br />Update <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />0.750 <br />1.200 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />Abbreviation: None <br />Page 1 of 2 <br />Permit/Job #: M1992016 <br />Filename: MO16 -002 <br />CIRCES Cost Estimating Software <br />