My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-14_INSPECTION - M1992016
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1992016
>
2012-12-14_INSPECTION - M1992016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:23 PM
Creation date
12/17/2012 3:11:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992016
IBM Index Class Name
INSPECTION
Doc Date
12/14/2012
Doc Name
INSPECTION REPORT
From
DRMS
To
OPERATOR
Inspection Date
6/4/2012
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Backfill mined slopes <br />Permit Action: 2003 AMO2 Unit Cost <br />Site: Penrose Ranch's Update <br />PROTECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Total work team cost/hour: $198.32 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />001 <br />12/10/2012 <br />TC1 <br />County: Fremont <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />10,600 <br />11,925 <br />State: Colorado <br />Equipment Description <br />Cat 623G <br />NA <br />NA <br />NA <br />NA <br />NA <br />COSTShift basis: 1 per day <br />Support Equipment <br />Abbreviation: None <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />2,650 lbs/LCY <br />Decomposed rock - 25% Rock, <br />75% Earth <br />55,200 pounds <br />20.83 LCY <br />Swell factor: 1.125 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />18.00 <br />23.00 <br />Average Volume: 20.50 <br />Adjusted Capacity: 20.50 <br />Page 1 of 2 <br />Permit/Job#: M1992016 <br />Filename: MO16 -001 <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CLRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$64.15 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$109.22 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$198.32 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$198.32 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />SCRAPER TEAM WORK <br />Task description: Backfill mined slopes <br />Permit Action: 2003 AMO2 Unit Cost <br />Site: Penrose Ranch's Update <br />PROTECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Total work team cost/hour: $198.32 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />001 <br />12/10/2012 <br />TC1 <br />County: Fremont <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />10,600 <br />11,925 <br />State: Colorado <br />Equipment Description <br />Cat 623G <br />NA <br />NA <br />NA <br />NA <br />NA <br />COSTShift basis: 1 per day <br />Support Equipment <br />Abbreviation: None <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />2,650 lbs/LCY <br />Decomposed rock - 25% Rock, <br />75% Earth <br />55,200 pounds <br />20.83 LCY <br />Swell factor: 1.125 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />18.00 <br />23.00 <br />Average Volume: 20.50 <br />Adjusted Capacity: 20.50 <br />Page 1 of 2 <br />Permit/Job#: M1992016 <br />Filename: MO16 -001 <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CLRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.