Laserfiche WebLink
November 15, 2012 C-1981-012/New Elk Mine DIH <br /> A berm has been built up along the east side of the flat area to the northeast of the RDA so as to prevent run-off <br /> from this area draining untreated into the undisturbed canyon to the east. Hay bales were in the process of being <br /> installed at this area and at the "cell phone tower area"immediately to the south of the first area. <br /> .a <br /> c <br /> Photo of built-up berm,northeast of RDA Photo of hay bales about to be installed near cell tower. <br /> Work has been done to improve the drainage off of the refuse placed at the NE corner of the RDA; a bit more <br /> work is needed to help the remaining water drain off the RDA surface. Culvert C6, located immediately west of <br /> the guard shack,needs a bit of cleaning out. <br /> a'.. <br /> t' <br /> Photo of drainage improvement,NE corner of RDA. Photo of area of inlet of Culvert C6. <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 6 of 9 <br />