Laserfiche WebLink
Revised 11/15/81 <br /> 2.05.4 Reclamation Plan <br /> Reclamation of the disturbed area within the permit area at the Maxwell <br /> Mine will be completed at the end of the anticipated mining operation. <br /> Because the Maxwell Mine is an underground mine which was constructed in <br /> 1976 and which began production in 1977, CF&I Steel Corporation <br /> anticipates that reclamation of the existing disturbed area will not be <br /> completed for approximately 40 or more years. The existing mine's area <br /> of operation is shown on the Mine Plan Map (Map 3). This Map shows the <br /> general reserves which will be mined during this period. During this <br /> extended life of the operation, all of the structures and surface <br /> facilities at the Maxwell Mine will be in service. In addition, CF&I <br /> Steel Corporation plans to continue mining in the Maxwell Mine area <br /> during the future and may utilize the structures currently used at the <br /> Maxwell Mine for other mining operations. Should these structures be <br /> required for other mining operations, CF&I Steel Corporation will <br /> provide the necessary plans and applications for approval by Colorado <br /> Mined Land Reclamation Division. As reviewed in the Mine Plan portion <br /> of this application, CF&I Steel Corporation will maintain the structures <br /> and surface facilities in a manner such that they will provide safe <br /> working conditions to the employees and the general public and not cause <br /> adverse environmental impacts. <br /> A detailed timetable for the completion of each major step in the <br /> anticipated reclamation plan is shown in Table 15, Reclamation <br /> Timetable. In addition, the backfilling and grading plan which CF&I <br /> Steel Corporation plans to follow is shown on the Post-Mining Topography <br /> Map (Map 15) . The relationship of existing slopes and topography with <br /> the planned backfilling and grading plan is shown in the Post-Mining <br /> Cross Sections (Map 16). <br /> Reclamation of the structures and facilities at the Maxwell Mine, as <br /> shown in Table 15, Reclamation Timetable, will involve the dismantling, <br /> salvage, and removal of all existing structures. These structures <br /> include the tipple, breaker, silo, hoist house, office, warehouse, <br /> 2.05-27 <br />