Laserfiche WebLink
2 <br /> CF&I urges the Division to adopt a regional approach to <br /> alluvial valley floor concerns to avoid the embarrassment the <br /> scenario described above implies. CF&I feels adequate <br /> information is available to the Division to make the necessary <br /> determination to avoid stipulations for side canyons tributary to <br /> the Puratoire system. <br />