Laserfiche WebLink
5 INSTALLATION <br /> 5.1 Assemblies shall be installed to the lines and grades shown on the <br /> Drawings. <br /> 5.2 Any field modifications to fabricated assemblies shall be cleaned, primed, <br /> and touched up with the specified paint system. <br /> 5.3 The stage level markings shall be surveyed in, and shall reflect a true <br /> vertical distance. <br /> 5.4 SLUICE GATE <br /> 5.4.1 The outlet sluice gate, gate stem, stem guides, operator, oil seals, <br /> and other appurtenant assemblies shall be installed in strict <br /> conformance with the manufacturer's recommendations and <br /> installation drawings. <br /> 5.4.2 The Contractor shall verify the dimension from the operating face <br /> of the gate to the centerline of the gate stem to ensure proper <br /> positioning of the gate stem blockout though the back wall of the <br /> intake structure. <br /> SPEC. D- STRUCTURAL STEEL <br /> PAGE 5 <br />