Laserfiche WebLink
4.4 Bolt holes shall be sized one-sixteenth inch (1/16") larger than the bolt <br /> diameter for bolts one-half inch (1/2") and smaller, and one-eighth inch <br /> 0/8") larger than the bolt diameter for bolts larger than one-half inch (1/2") <br /> in diameter. <br /> 4.5 Prior to final painting, all components of matching assembly shall be <br /> assembled in the shop to verify alignment and fitting. <br /> 4.6 After shop verification of alignment, all components that will be exposed <br /> shall be sand blasted and painted with one (1) primer coat and one(1)finish <br /> coat. <br /> 4.7 All components or faces of components to be embedded in concrete shall <br /> be sand blasted and painted with one (1) primer coat only. <br /> 4.8 RESERVOIR STAGE MARKER <br /> 4.8.1 The reservoir stage marker will be painted on structural tee <br /> installed in accordance with the Drawings and Specifications, and <br /> painted with gage height markings as provided herein. <br /> 4.8.2 The structural tee shall be primed and painted with one (1) prime <br /> and two (2) finish coats, colored 2010 Eggshell. Surfaces to be <br /> painted shall be prepared in accordance with SSPC SP 1 and in <br /> accordance with SP 2 or SP 3 as required. <br /> 4.8.3 Reservoir level markings shall be painted on the tee at one-tenth <br /> of a foot (1/10') vertical intervals beginning with the invert <br /> elevation of the outlet gate (level 0.0) and ending at one foot (1') <br /> below the crest of the dam. <br /> 4.8.4 Beginning at the outlet invert elevation, each one foot(1') interval <br /> shall be marked and numbered with corresponding reservoir gage <br /> height in numbers not less than two inches (2") in height. A <br /> number template shall be used. <br /> SPEC.D- STRUCTURAL STEEL <br /> PAGE 4 <br />