My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:14 PM
Creation date
12/10/2012 7:27:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/7/2012
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: AMEC Mill Site Earthworks Field Monitoring
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />Samples Obtained <br />DCF — 0 <br />SLF — 0 <br />OVF — 3 <br />MWB -1 <br />MWDR — 0 <br />Testing Performed <br />SLF Moisture /Density — 0 <br />SLF Depth Checks — 0 <br />MSE Moisture /Density - 38 <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue overburden fill placement. <br />Continue drain cover placement. <br />Continue MSE wall construction. <br />Summary of Non - conformances: <br />None Issued <br />amec( <br />Summary of Meetings and Discussions: <br />CC &V: <br />CC &V held a weekly construction meeting on November 27, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />AMEC: <br />Daily toolbox safety meeting were attended by AMEC personnel. <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />December 1, 2012. <br />Thorne Clark, CQA Monitor Date: December 01 2012 <br />MEW Weekly Report WE 12.01.2012.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.