Foundation preparation occurred and proof rolled. An amec field representative observed the <br />proof roll and found the foundation was acceptable to proceed with wall construction. Wall <br />components were installed for Mat # 1. An amec field representative inspected and approved <br />placed backfill materials, which was determined acceptable per the plans and specifications to <br />continue with the installation of remaining wall components. <br />Wall #3 <br />No work was performed on MSE wall #3. Progress is focused on walls 1 and 2. <br />Wall #4 <br />Construction completed for MSE wall #4 during the night shift on November 29/30 <br />amee <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed DCF placement within the Mill Site Earthworks project, including ambient and fill <br />temperature monitoring when necessary. <br />AMEC observed overburden fill placement for the Mill Site Earthworks project, including ambient and fill <br />temperature monitoring when necessary. <br />AMEC observed construction of MSE Wall's 1, 2, 3 and 4. <br />MEW Weekly Report WE 12.01.2012.docx <br />