2012-12-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:14 PM
Creation date
12/10/2012 7:27:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/7/2012
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: AMEC Mill Site Earthworks Field Monitoring
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />E.Cresson Clay Process <br />0 <br />81,150 <br />SLF processing is temporarily paused <br />Total <br />0 <br />81,510 <br />SLF processing is temporarily paused <br />Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />Total <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />amee <br />C) Soil Liner Fill (SLF) <br />Soil liner fill placement is complete for the Mill Site Earthworks project. This figure has been <br />removed from the weekly reports. <br />D) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement performed in the area shown on Figure 2. The DCF was hauled <br />from the processing area to the placement area using 40 -ton articulating haul trucks loaded by a <br />CAT 988 (250703) and a CAT 992 (250601) front -end loader. The DCF was placed in a 2 -foot lift <br />using various CAT dozers except where haul routes were established. Haul routes consisted of <br />four -foot lifts to be spread into 2 -foot lifts later. Laborers were present at all times during <br />placement removing debris /sandbags and assisting the dozer operator with lift thickness. All DCF <br />was placed on previously approved primary geomembrane. AMEC field representatives <br />monitored the DCF placement constantly. <br />Temperatures were monitored by an AMEC field representative prior to fill placement when <br />ambient temperatures were below 32 °F. Fill material was not placed until the entire fill area was at <br />or above 32 °F. Fill temperatures averaged between 35 °F and 44 °F <br />II) Geosynthetics <br />A) Geomembrane <br />No work performed during the week. <br />III) Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />IV) MSE Wall Construction <br />Wall #1 <br />Installation of wall components was performed for Mat's 1 and 2. An amec field representative <br />inspected and approved placed backfill materials, which was determined acceptable per the plans <br />and specifications to continue with the installation of the remaining wall components. <br />Wall #2 <br />MEW Weekly Report WE 12.01.2012.docx <br />