Laserfiche WebLink
amecP <br />ATTACHMENT A <br />2012 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />MILL SITE EARTHWORKS <br />Name <br />NOV 25 <br />NOV 26 <br />NOV 27 <br />NOV 28 <br />NOV 29 <br />NOV 30 <br />Dec 1 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />- <br />- <br />Thorne Clark <br />- <br />LS <br />LS <br />LS <br />LS <br />- <br />LS <br />Uwe Kelley <br />- <br />ST <br />ST <br />ST <br />ST <br />- <br />ST <br />Dennis Koval* <br />- <br />ST <br />ST <br />ST <br />ST <br />- <br />ST <br />Ben Melly <br />- <br />LG <br />LG <br />LG <br />LG <br />- <br />LG <br />Robert Redd <br />- <br />LT <br />LT <br />LT <br />- <br />- <br />- <br />Madison Crouch <br />- <br />LT <br />LT <br />LT <br />LT <br />- <br />LT <br />Ryan Fesler <br />- <br />ST <br />ST <br />ST <br />ST <br />- <br />LT <br />Alyssa Wagner <br />- <br />LT <br />LT <br />LT <br />- <br />- <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Ron Arlian <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />Engineer <br />Engineer <br />Manager <br />MEW Weekly Report WE 12.01.2012.docx <br />PS = Project Sponsor <br />PCE = Project Certifying <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory <br />SE = Senior Engineer <br />