Laserfiche WebLink
PAW-7 Alluvial well located adjacent to Pond 005 and existing <br /> Pond 003 at the Golden Eagle Mine. Established to moni- <br /> tor alluvial ground water downdip of Pond 005. <br /> CCAW-1 Alluvial well located in the Ciruela Canyon alluvium at <br /> the mouth of Ciruela Canyon. Established to monitor <br /> potential effects of Golden Eagle mining and surface <br /> facilities activities in the canyon and coal processing <br /> waste bank construction. <br /> ACAW-1 Alluvial well located in the Apache Canyon alluvium at <br /> the mouth of Apache Canyon. Established to monitor <br /> potential effects of secondary or retreat mining. This <br /> station is currently inactive as per CMLRD approval. <br /> RDA Pond Settling pond located at the base of the Refuse Disposal <br /> Area of the New Elk Mine. <br /> Contained in the following sections is a description of the <br /> methods and results for the 1989 water year monitoring activities <br /> conducted at the New Elk and Golden Eagle Mine sites. <br /> -6- <br />