Laserfiche WebLink
TABLE 1 <br /> HYDROLOGY MONITORING REQUIREMENTS <br /> NEW ELK AND GOLDEN EAGLE MINES <br /> Revised Stipulation No. 12 . New Elk Mine and Stipulation No. 10, <br /> Golden Eagle Mine, August 1985 <br /> Water <br /> Level or Field Short Discharge NPDES <br /> Site Flow Measure. * List* List* List* <br /> PRS-1 M M A <br /> PRS-2 M M A <br /> PRS-3 M M A <br /> WPD-1 M M A Q <br /> MDNE-1 M M A Q <br /> MDGE-1 M M A Q <br /> CCS-1 M M A Q <br /> CCS-2 M M A Q <br /> LCS-1 M M A Q <br /> WCS-1 M M A Q <br /> CHC-1 M M A Q <br /> ACF-1** C Q <br /> SCF-1** C Q <br /> PAW-1 Q Q A <br /> PAW-2 Q Q A <br /> PAW-3 Q Q A <br /> PAW-4 Q Q A <br /> PAW-5 Q Q A <br /> PAW-6 Q Q A Q <br /> PAW-7 M M A Q <br /> RDA Pond A <br /> ACAW-1** Q Q A <br /> CCAW-1 Q Q A <br /> NPDES Stations: <br /> NE 001 *** (Mine Discharge) W M <br /> NE 003 (Sewage Treatment) W M <br /> NE 004 (Pond) W M <br /> NE 005 (Pond) W M <br /> NE 006 (Pond) W M <br /> NE 007 (Pond) W M <br /> NE 008 *** (Pond) W M <br /> GE 045 (Sewage Treatment) W M <br /> GE 002 *** (Mine Discharge) W M <br /> GE 003 (Pond) W M <br /> GE 004 (Pond) W M <br /> GE 005 (Pond) W M <br /> KEY: <br /> C = continuously <br /> W = weekly <br /> M = monthly <br /> Q = quarterly (February, May, August, Novemer) <br /> A = annually (November) <br /> * See Table 2 for parameters included in each suite. <br /> ** Not required until further disturbance as per revised Stipula- <br /> tion No. 14 . <br /> *** NE 001 is the same site as MDNE-1; GE 002 is the same site as <br /> MDGE-1; and NE 008 is the same site as RDA Pond. <br /> -7- <br />