07/21/1997 08:45 3035724444 CROW COMPANY PAGE 04 <br /> Monitored Make-up Water Test WARMNG. Explosive Failure. Piping system <br /> rupture dsWag pneumatic pressure testing may <br /> The test procedure consists of initial expansion, result in the explosive,uncontrolled movement <br /> and test phases. During the initial expansion of system piping,or components,or parts of <br /> phase,the test section is pressurized to the test components Keep personnel a safe distance <br /> pressure,and enough make-up liquid is added away from the test section daring testing. <br /> each hour for three(3)hours to return to test Pneumatic testing(testing with a gas under <br /> pressure. pressure)should not be considered unless one of <br /> The test phase follows immediately,and may be the following conditions exist: <br /> one(1).two(2).or three(3)hours. At the end of <br /> the test time,the test section is returned to test • when the piping system is so designed that is <br /> pressure by adding a measured amount of liquid. cannot be filled with liquid;or <br /> If the amount of make-up liquid added does not • where the system service cannot <br /> exceed Table 1 values.leakage is not indicated. piping y <br /> tolerate traces of a liquid testing medium. <br /> The testing medium should be non-flammable and <br /> Non-monitored Make-Up Water Test non-toxic.The test pressure should not exceed the <br /> maximum allowable test pressure for any <br /> The test procedure consists of initial expansion, non-isolated component in the test section. <br /> and test phases. For the initial expansion phase, Leaks may be detected using mild soap and water <br /> • makeup water is added as required to maintain ft solutions(detergents should be avoided),or other <br /> test pressure for three(3)hours. For the test acceptable leak detecting fluids,applied to the <br /> phase,the test pressure is reduced by 10 psi. If joint. Bubbles indicate leakage. After leak <br /> the pressure remains steady(within 5%of the testing,all soap solutions or leak detecting fluids <br /> target value)for an hour,no leakage is indicated. should be rinsed off the system with clean water. <br /> PNEUMATIC TESTING High Pressure Procedure <br /> For continuous pressure rated pipe systems,the <br /> Guidelines pressure in the test section should be gradually <br /> increased to not more than one-half the test <br /> CAUTION., Pneumatic testing should not be pressure,then increased in small Increments until <br /> used unless the Owner and the responsible the required test pressure is reached. Test <br /> Project Engineer specify pneumatic testing or pressure should be maintained for ten(10)to sixty <br /> approve Its use as an alternative to hydrostatic (60)minutes,then reduced to the design pressure <br /> testing, rating,and held for such time as required to <br /> PIPING SYSTEM PRESSURE TESTING examine the system for leaks. <br /> USING PNEUMATIC TESTING IS NOT <br /> RECOMMENDED, <br /> WARNING. Compressed air or any pressurized <br /> gas used as a test medium may present severe <br /> hazards to personnel near lines being tested <br /> take extra personnel protection precautions <br /> when a gas under pressure It used as the test <br /> medhun. <br />