Laserfiche WebLink
07/21/1997 08:45 3035724444 CROW COMPANY PAGE 05 <br /> toyâ–ºPrewure Procedure Procedure: <br /> For pipe and components rated for gravity flow, The piping system should be gradually Drought up <br /> intermittent low pressure,or low pcesstrm service. to normal operating pressure,and held at <br /> the required test presaue should be maintained for operating pressure for at had ten(10)minutes. <br /> ten(10)minutes to one(1)hour,but not more During this tune,Joints and connections should be <br /> than one(1)hour. examined for visual evidence of leakage. <br /> Leairage inspections may be performed during this <br /> time. If the test pressure remains steady(within <br /> 5%of the target value)for the test time,no NON-TESTABLE SYSTEMS <br /> leakage is indicated <br /> TEST PRESSURE RATINGS MUST NOT BE Guidelines <br /> EXCEEDED. <br /> Some systems may not be suitable for pressure <br /> testing. These systems may contain <br /> INITIAL SERVICE TESTING non-isolatable components,or temporary closures <br /> may not be practical. Such systems should be <br /> carefully inspected during and after installation. <br /> Guidelines Inspections such as visual examination of joint <br /> An initial service test may be acceptable when appearance,meduuUcal checks of bolt for joint <br /> tightness.and other relevant examinations should <br /> other types of tests are not practical,or when leak be performed, <br /> tightness can be demonstrated by normal service, <br /> or when performing initial service tests of other <br /> equipment. An initial service test may apply to <br /> systems where isolation or temporary closures are Plexcolspirolite <br /> impractical.or where checking out pumps and 1050 Busse Highway,Suite 200 <br /> other equipment affords the opportunity to Bensenville,IL 60106 <br /> examine the system for leakage prior to full scale (708)350-3700 <br /> operations. <br /> Rev.1/92 01991 Chevron Chemical Company <br />