amec-_- <br />D) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement performed in the area shown on Figure 2. The DCF was hauled <br />from the processing area to the placement area using 40 -ton articulating haul trucks loaded by a <br />CAT 988 front -end loader. The DCF was placed in a 2 -foot lift using various CAT dozers except <br />where haul routes were established. Haul routes consisted of four -foot lifts to be spread into 2- <br />foot lifts later. Laborers were present at all times during placement removing debris /sandbags and <br />assisting the dozer operator with lift thickness. All DCF was placed on previously approved <br />primary geomembrane. AMEC field representatives monitored the DCF placement constantly. <br />Temperatures were monitored by an AMEC field representative prior to fill placement when <br />ambient temperatures were below 32 °F. Fill material was not placed until the entire fill area was at <br />or above 32 °F. Fill temperatures averaged between 34 °F and 43 °F <br />This Week <br />Cumulative <br />Location <br />(tons) <br />(tons) <br />Comments <br />E.Cresson Clay Process <br />0 <br />81,150 <br />SLF processing is temporarily paused <br />Total <br />0 <br />81,510 <br />SLF processing is temporarily paused <br />D) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement performed in the area shown on Figure 2. The DCF was hauled <br />from the processing area to the placement area using 40 -ton articulating haul trucks loaded by a <br />CAT 988 front -end loader. The DCF was placed in a 2 -foot lift using various CAT dozers except <br />where haul routes were established. Haul routes consisted of four -foot lifts to be spread into 2- <br />foot lifts later. Laborers were present at all times during placement removing debris /sandbags and <br />assisting the dozer operator with lift thickness. All DCF was placed on previously approved <br />primary geomembrane. AMEC field representatives monitored the DCF placement constantly. <br />Temperatures were monitored by an AMEC field representative prior to fill placement when <br />ambient temperatures were below 32 °F. Fill material was not placed until the entire fill area was at <br />or above 32 °F. Fill temperatures averaged between 34 °F and 43 °F <br />II) Geosynthetics <br />A) Geomembrane <br />No work performed during the week. <br />III) Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />IV) MSE Wall Construction <br />A) Wall #3 <br />Installation of wall components was performed for Mat #6. Mat #6 was inspected and approved <br />for wall backfill placement. MSE wall #3 construction paused at approximately 2pm on the 19th <br />and efforts were focused on the construction of MSE wall #4 <br />B) Wall #4 <br />Wall components and backfill materials for Mat # 4 thru Mat #6 were inspected and accepted by <br />an AMEC field representative. Mat #7 began on the 21St and did not complete prior to end of shift. <br />Nuclear density testing was performed on the wall backfill for each Mat as needed. Testing and <br />inspections resulted in passing tests. <br />MEW Weekly Report WE 11.24.2012.docx <br />This Week <br />Cumulative <br />Location <br />(tons) <br />(tons) <br />Comments <br />DCF Process <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />Total <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />II) Geosynthetics <br />A) Geomembrane <br />No work performed during the week. <br />III) Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />IV) MSE Wall Construction <br />A) Wall #3 <br />Installation of wall components was performed for Mat #6. Mat #6 was inspected and approved <br />for wall backfill placement. MSE wall #3 construction paused at approximately 2pm on the 19th <br />and efforts were focused on the construction of MSE wall #4 <br />B) Wall #4 <br />Wall components and backfill materials for Mat # 4 thru Mat #6 were inspected and accepted by <br />an AMEC field representative. Mat #7 began on the 21St and did not complete prior to end of shift. <br />Nuclear density testing was performed on the wall backfill for each Mat as needed. Testing and <br />inspections resulted in passing tests. <br />MEW Weekly Report WE 11.24.2012.docx <br />