amec---�, <br />MILL SITE EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: Mill Site Earthworks <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Mill Site Earthworks <br />Date: November 24, 2012 <br />Reporting Period: 11/18/2012 through 11/24/2012 <br />Days <br />S <br />M <br />T <br />W <br />I T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />- <br />- <br />- <br />N <br />N <br />N <br />- <br />- <br />- <br />- <br />D = Day Shift <br />N = <br />Night Shift <br />Project No.: 74201125K0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day /Night <br />Ambient Temperature Range (°F): Low: 20 °F to 31'F ( + / -) High: 43 °F to 52 °F <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />Ames: Work activities were paused on Wednesday afternoon November 21 sc at 3pm for the Holiday. <br />Construction is expected to resume Monday November 26, 2012. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) Overburden Fill Placement <br />Overburden fill material was delivered from CC &V Mine Operations throughout the day shift. An <br />Ames CAT D -10 dozer was used to maintain the borrow area. A CAT 992 and CAT 988 front -end <br />loader were used to load overburden fill material into 777 haul truck's and CAT 40 -ton articulating <br />haul trucks. <br />Overburden fill was placed in the areas shown on Figure 1. DCF depth was checked by survey <br />and the area was approved prior to fill placement above DCF. Overburden fill was placed in 36" <br />to 40" lifts using various CAT dozers. Each lift was moisture conditioned using a tandem axle <br />water truck (when necessary) and compacted using a 10 -ton vibratory smooth drum compactor, <br />passing over the entire fill surface at least 4 times (method compaction technique was applicable). <br />Temperatures were monitored by an AMEC field representative prior to fill placement when <br />ambient temperatures were below 32 °F. Fill material was not placed until the entire fill area was at <br />or above 32 °F. Fill temperatures averaged between 33 °F and 42 °F. <br />B) Slope Contouring <br />Slope contouring of placed overburden fill was performed using a CAT 330 excavator. Material <br />generated during slope contouring was placed as overburden fill at the top of the slope. <br />C) Soil Liner Fill (SLF) <br />Soil liner fill placement is complete for the Mill Site Earthworks project. This figure has been <br />removed from the weekly reports. <br />MEW Weekly Report WE 11.24.2012.docx <br />