Laserfiche WebLink
Bowie No 2 Mule TR -72 Page 4 of 7 <br />SCRAPER TEAM WORK <br />Task description. Replace Topsoil from Stockpile to Gob Pile #2 <br />Site Bowie No. 2 Mine Permit Action TR 72 Pennit /Job# C 1096083 <br />PROJECT IDENTIFICATION <br />Task #: 121 State Colorado <br />Date. 6/13/2012 County Delta <br />User. SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper I Cat 6270 R <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor (Trader: NA <br />-Water Truck- NA <br />Abbreviation None <br />Filename 0083 -121 <br />COSTSluft basis: der day <br />Cost Breakdown: Scraner Work Team Sunno t F.aurnment Maintenance Fnuinment <br />Total N ork team cost/lnour. $547.82 <br />MATERIAL QUANTITIES <br />Initial volume 1,307 CCY <br />Loose volume 1,470 LCY <br />Source of estimated volume Appendix A <br />Source of estimated sA ell factor Cat Handbook <br />HOURLY PRODUCTION <br />Material N eight: 2,550 lbs/LCY <br />Material description: Earth - Dn- packed <br />Rated Pavload: 52,800 pounds <br />Payload Capacity- 20.71 LCY <br />SAN-ell factor 1 125 <br />Scraner Bowl ( volume) Basis <br />Struck Volume <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine. <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost /hour <br />$68 13 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost /Inour <br />$180.83 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op cost/hour <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour <br />$2495 <br />NA <br />NA <br />NA <br />NA <br />NA <br />i Jnit Subtotals <br />$273 91 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units <br />2 <br />0 <br />0 <br />0 <br />(1 <br />0 <br />Group Subtotals <br />Work <br />$547.82 <br />Support <br />$0 00 <br />Maiint <br />$0 00 <br />Total N ork team cost/lnour. $547.82 <br />MATERIAL QUANTITIES <br />Initial volume 1,307 CCY <br />Loose volume 1,470 LCY <br />Source of estimated volume Appendix A <br />Source of estimated sA ell factor Cat Handbook <br />HOURLY PRODUCTION <br />Material N eight: 2,550 lbs/LCY <br />Material description: Earth - Dn- packed <br />Rated Pavload: 52,800 pounds <br />Payload Capacity- 20.71 LCY <br />SAN-ell factor 1 125 <br />Scraner Bowl ( volume) Basis <br />Struck Volume <br />15.70 <br />LCY <br />Heaped Volume <br />22.00 <br />LCY <br />Average Volume. <br />1885 <br />LCY <br />Ad)tisted Capacity <br />18.85 <br />LCY <br />CIRCES Cost Estimating Soffi are <br />