My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C1996083A (12)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2012-06-20_PERMIT FILE - C1996083A (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:09 PM
Creation date
12/4/2012 12:49:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
6/20/2012
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate TR72
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BON ie No 2 Mme TR -72 Page 3 of 7 <br />CN-cle Tune: <br />Scraper Loading Time* 0 90 Minutes <br />Maneuver and Spread Time 0.60 Minutes <br />Job Condition Correction: Site Altitude 6100 feet <br />Net Correction 0.830 I NA <br />Travel Time: <br />Road Condition. Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Total Res <br />M) <br />Altitude Adj: <br />1 000 <br />NA <br />(CAT HB) <br />Job Efficiencv: <br />0.830 <br />NA <br />(CAT HB) <br />Net Correction 0.830 I NA <br />Travel Time: <br />Road Condition. Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />M) <br />Roll. Res <br />M) <br />Total Res <br />M) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />240000 <br />10.00 <br />500 <br />1500 <br />734 <br />329 <br />Haul Time 3.29 minutes <br />Return Rnute <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />M) <br />Roll. Res <br />M) <br />Total Res <br />M) <br />Velocity- (fpm) <br />Travel Time <br />(min) <br />1 <br />240000 <br />-l0 00 <br />500 <br />-5.00 <br />2938 <br />086 <br />CIRCES Cost Estimating Sot2«are <br />Return Tune: <br />0.86 <br />minutes <br />Total Scraper team cycle time: <br />5.65 <br />minutes <br />Adjusted for fob conditions- <br />320.96 <br />LCY/Hour <br />Selected Number of Scrapers <br />2 <br />Scraper(s) <br />Adjusted single scraper <br />team (unit) hourly production: <br />32096 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production. <br />320.96 <br />LCY/Hour <br />Unadjusted unit production/hour <br />386.70 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size I Team(s) <br />Totalfob time <br />16.34 <br />Hours <br />Unit cost $1.707 /LCY <br />Total fob cost. <br />$8,950.06 <br />CIRCES Cost Estimating Sot2«are <br />
The URL can be used to link to this page
Your browser does not support the video tag.