Laserfiche WebLink
BoAvie No. 2 Mme TR -72 Page 5 of 7 <br />Cvcle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time <br />Job Condition Correction <br />0.90 Minutes <br />0.60 Minutes <br />Site Altitude 6750 feet <br />Net Correction 0.830 NA <br />Travel Tune: <br />Road Condition Rutted dirt. little maintenance, no water. 2° tire penetration 5.0 <br />Rml Route <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj. <br />1 000 <br />NA <br />(CAT HB) <br />Job Efficiencv: <br />0 830 <br />NA <br />(CAT HB) <br />Site Altitude 6750 feet <br />Net Correction 0.830 NA <br />Travel Tune: <br />Road Condition Rutted dirt. little maintenance, no water. 2° tire penetration 5.0 <br />Rml Route <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />M) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />I <br />1000 00 <br />5.00 <br />500 <br />10 00 <br />1068 <br />0.97 <br />Haul Time. 0.97 minutes <br />Rehirn Rimte <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />M) <br />Roll. Res <br />M) <br />Total Res <br />M) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1000.00 <br />-500 <br />5.00 <br />0.00 <br />2921 <br />044 <br />Return Time: <br />Total Scraper team cycle tune: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production - <br />Unadjusted unit production/hour 777 32 LCY/Hour <br />Optimal Number of Scrapers per push dozer <br />JOB TIME AND COST <br />0.44 <br />minutes <br />2.91 <br />minutes <br />645.18 <br />LCY/Hour <br />2 <br />Scraper(s) <br />6=45.18 <br />LCY/Hour <br />645.18 <br />LCY/Hour <br />Fleet size I Team(s) Total job tune. 2.28 Hours <br />Unit cost $0849 ICY Total job cost- $1,248.50 <br />CIRCES Cost Estimating Softwire <br />