My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C1996083A (12)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2012-06-20_PERMIT FILE - C1996083A (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:09 PM
Creation date
12/4/2012 12:49:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
6/20/2012
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate TR72
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BoAvie No. 2 Mme TR -72 Page 5 of 7 <br />Cvcle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time <br />Job Condition Correction <br />0.90 Minutes <br />0.60 Minutes <br />Site Altitude 6750 feet <br />Net Correction 0.830 NA <br />Travel Tune: <br />Road Condition Rutted dirt. little maintenance, no water. 2° tire penetration 5.0 <br />Rml Route <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj. <br />1 000 <br />NA <br />(CAT HB) <br />Job Efficiencv: <br />0 830 <br />NA <br />(CAT HB) <br />Site Altitude 6750 feet <br />Net Correction 0.830 NA <br />Travel Tune: <br />Road Condition Rutted dirt. little maintenance, no water. 2° tire penetration 5.0 <br />Rml Route <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />M) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />I <br />1000 00 <br />5.00 <br />500 <br />10 00 <br />1068 <br />0.97 <br />Haul Time. 0.97 minutes <br />Rehirn Rimte <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />M) <br />Roll. Res <br />M) <br />Total Res <br />M) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1000.00 <br />-500 <br />5.00 <br />0.00 <br />2921 <br />044 <br />Return Time: <br />Total Scraper team cycle tune: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production - <br />Unadjusted unit production/hour 777 32 LCY/Hour <br />Optimal Number of Scrapers per push dozer <br />JOB TIME AND COST <br />0.44 <br />minutes <br />2.91 <br />minutes <br />645.18 <br />LCY/Hour <br />2 <br />Scraper(s) <br />6=45.18 <br />LCY/Hour <br />645.18 <br />LCY/Hour <br />Fleet size I Team(s) Total job tune. 2.28 Hours <br />Unit cost $0849 ICY Total job cost- $1,248.50 <br />CIRCES Cost Estimating Softwire <br />
The URL can be used to link to this page
Your browser does not support the video tag.