Ryan Stitt <br />Denver Water NRC SWSP <br />November 27, 2012 <br />Page 6 of 8 <br />The Applicant provided the following table of the projected replacement obligation for the <br />Hazeltine Reservoir site. The projection assumes that the liner for the reservoir will be fully <br />completed and tested by August 2013 after which evaporation and other consumptive uses will <br />cease. <br />Table 2: Projected Replacement Obligation <br />Conditions of Approval <br />I hereby approve this SWSP in accordance with § 37 -90- 137(11), C.R.S., subject to the <br />following conditions: <br />1. This plan is approved with an effective date of October 1, 2012 and shall be valid through <br />October 31, 2014 unless otherwise revoked or modified. If this plan will not be made <br />absolute by a water court action by the plan's expiration date, a renewal request must be <br />submitted to this office with the statutory fee (currently $257 /pit) for each gravel pit no <br />later than September 15, 2014. <br />2. Well permits 60313 -F, and 67261 -F has been obtained in accordance with § 37 -90- <br />137(2) and (11), C.R.S., and remain in effect for Road Runners Rest II pit and Howe pit, <br />respectively. Should a new well permit be required but then denied for reasons of 600 <br />foot spacing, or any other legitimate reason, approval of this substitute supply plan may <br />be cancelled. <br />3. A well permit has not been obtained for the Reclamation Pit No. 1. This pit is a part of <br />Hazeltine Reservoir which includes the neighboring Road Runners Rest II pit. The <br />exposed surface area of the Hazeltine Reservoir is within the limits set forth under the Road <br />Runners Rest II pit well permit. The Hazeltine Reservoir has been lined and will undergo <br />the liner leak test in WY 2013, after which a well permit will not be required. For this <br />reason, the Applicant is not currently required to apply for a well permit for Reclamation Pit <br />No. 1. However, If the reservoir is not approved as a lined reservoir by the end of WY <br />2013, then a well permit will be required in accordance with § 37 -90- 137(2) and (11), <br />C.R.S. Should a well permit be denied for reasons of 600 foot spacing, or any other <br />legitimate reason, approval of this SWSP may be cancelled. <br />2010 <br />2011 <br />2012 <br />2013 <br />2014 <br />2015 <br />2016 <br />January <br />2.21 <br />2.62 <br />3.2 <br />1.76 <br />0.64 <br />0.11 <br />February <br />2.05 <br />2.42 <br />2.97 <br />1.6 <br />0.54 <br />0 <br />March <br />2.25 <br />2.58 <br />2.93 <br />1.4 <br />0.47 <br />April <br />2.72 <br />3.21 <br />3.2 <br />1.25 <br />0.42 <br />May <br />0.84 <br />2.9 <br />4.03 <br />3.81 <br />1.17 <br />0.4 <br />June <br />2.31 <br />3.69 <br />5.21 <br />4.7 <br />1.1 <br />0.39 <br />July <br />3.62 <br />4.46 <br />6.1 <br />5.59 <br />1.06 <br />0.38 <br />August <br />4.63 <br />4.82 <br />6.49 <br />5.96 <br />1 <br />0.36 <br />September <br />4.82 <br />5.22 <br />6.3 <br />4.9 <br />0.98 <br />0.35 <br />October <br />4.22 <br />4.49 <br />5.44 <br />3.24 <br />0.94 <br />0.31 <br />November <br />3.28 <br />3.56 <br />4.51 <br />2.44 <br />0.89 <br />0.27 <br />December <br />2.59 <br />2.96 <br />3.68 <br />2.09 <br />0.72 <br />0.2 <br />Ryan Stitt <br />Denver Water NRC SWSP <br />November 27, 2012 <br />Page 6 of 8 <br />The Applicant provided the following table of the projected replacement obligation for the <br />Hazeltine Reservoir site. The projection assumes that the liner for the reservoir will be fully <br />completed and tested by August 2013 after which evaporation and other consumptive uses will <br />cease. <br />Table 2: Projected Replacement Obligation <br />Conditions of Approval <br />I hereby approve this SWSP in accordance with § 37 -90- 137(11), C.R.S., subject to the <br />following conditions: <br />1. This plan is approved with an effective date of October 1, 2012 and shall be valid through <br />October 31, 2014 unless otherwise revoked or modified. If this plan will not be made <br />absolute by a water court action by the plan's expiration date, a renewal request must be <br />submitted to this office with the statutory fee (currently $257 /pit) for each gravel pit no <br />later than September 15, 2014. <br />2. Well permits 60313 -F, and 67261 -F has been obtained in accordance with § 37 -90- <br />137(2) and (11), C.R.S., and remain in effect for Road Runners Rest II pit and Howe pit, <br />respectively. Should a new well permit be required but then denied for reasons of 600 <br />foot spacing, or any other legitimate reason, approval of this substitute supply plan may <br />be cancelled. <br />3. A well permit has not been obtained for the Reclamation Pit No. 1. This pit is a part of <br />Hazeltine Reservoir which includes the neighboring Road Runners Rest II pit. The <br />exposed surface area of the Hazeltine Reservoir is within the limits set forth under the Road <br />Runners Rest II pit well permit. The Hazeltine Reservoir has been lined and will undergo <br />the liner leak test in WY 2013, after which a well permit will not be required. For this <br />reason, the Applicant is not currently required to apply for a well permit for Reclamation Pit <br />No. 1. However, If the reservoir is not approved as a lined reservoir by the end of WY <br />2013, then a well permit will be required in accordance with § 37 -90- 137(2) and (11), <br />C.R.S. Should a well permit be denied for reasons of 600 foot spacing, or any other <br />legitimate reason, approval of this SWSP may be cancelled. <br />