My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
11/28/2012 3:04:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 1 of 3 2011 phase 5 valley leach facility ore storage 1 OF 1
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Prior to geomembrane deployment on the SLF, Ames proof - rolled, compacted, and <br />hand - worked the fill surface to be free of desiccation cracks and abrupt grade changes. <br />AMEC then inspected the surface. Sharp or angular stones greater than 0.75 inches in <br />diameter were removed from the finished surface. AMEC approved fill surfaces prior to <br />release to Lone Star for deployment. AMEC and Lone Star provided formal subgrade <br />approval prior to geomembrane deployment. Subgrade acceptance forms are presented in <br />Appendix G. <br />2.6 Bedding Fill <br />Bedding Fill was not required to be used during the construction of the 2011 Phase 5 VLF <br />OSA 3 Portion. <br />2.7 2011 Phase 5 VLF OSA 3rd Portion Composite Liner System <br />The 2011 Phase 5 VLF OSA 3 Portion is comprised of a primary composite liner, as <br />follows: <br />• The primary composite liner system in the 2011 Phase 5 VLF OSA 3rd <br />Portion consists of a minimum of 12 inches of compacted SLF overlain by <br />a layer of 80 -mil single -sided textured LLDPE geomembrane (textured <br />side down). <br />• The HVSCS is installed over the primary geomembrane. The HVSCS <br />consists of HVSCS piping and DCF (minimum of 2 feet). <br />The installation of the primary geomembrane layer in the 2011 Phase 5 VLF OSA 3 Portion <br />began in June 2011 and was completed in October 2011. Lone Star installed approximately <br />2,954,372 (neat line) square feet of 80 -mil single -sided textured LLDPE (textured side down) <br />geomembrane to the project specifications. <br />Geomembrane installation for the 2011 Phase 5 VLF OSA 3 Portion is discussed further in <br />Section 3.1. Ames anchored geomembrane at the limits of the 2011 Phase 5 VLF OSA 3rd <br />AMEC Earth & Environmental, Inc <br />2000 S Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 <br />www amec corn 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.