amee° <br />Portion and temporarily along the 10,060 and 10,130 to 10,180 ft elevations in an anchor <br />trench, with the dimensions of each trench a minimum of 3 feet deep by 1 foot wide. Ames <br />backfilled the anchor trenches with suitable anchor trench backfill material, or with SLF <br />material where the future primary geomembrane liner covers the anchor trench. Ames <br />placed anchor trench backfill in maximum 12- inch -thick compacted lifts. Anchor trench <br />backfill was compacted with a hand - operated 500 -pound vibratory compactor and "Jumping <br />Jack" compactors to project specifications. <br />2.8 High Volume Solution Collection System <br />The High Volume Solution Collection System (HVSCS) is comprised of HVSCS piping, the <br />HVSCS riser piping and foundation, and the HVSCS sump. The HVSCS piping is presented <br />in IFC Drawings A400 and A410. The portion of the 2011 Phase 5 VLF OSA 3 Portion <br />documented herein included installation of HVSCS piping only. As such, the HVSCS riser <br />system installed in the Pregnant Solution Storage Area (PSSA) is not discussed further in <br />this report. <br />Ames installed approximately 39,944 linear feet of 4 -inch diameter PCPE Tertiary HVSCS <br />pipe; 4,215 linear feet of 8 -inch diameter, and 3,025 linear feet of 12 -inch diameter PCPE <br />Secondary HVSCS pipe to project specifications. <br />Ames began installing the PCPE HVSCS pipes in June 2011, and completed in November <br />2011. Pipe locations are shown on Record Drawing No. 5 of 5 in Appendix A. Ames <br />haunched pipes with DCF and kept pipes in place during DCF placement. <br />A network of 4 -inch Tertiary HVSCS pipes were installed at approximately 100 feet <br />on- center at a minimum 2 percent grade, draining to the larger secondary PCPE HVSCS <br />pipes. Four -inch Tertiary HVSCS pipe sections were connected to each other using <br />couplings, and were attached to the secondary HVSCS pipe using ties. Laborers haunched <br />pipes with DCF and kept pipes in place during DCF placement. <br />AMEC Earth & Environmental, Inc <br />2000 S Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www amec corn 12 <br />