Laserfiche WebLink
Bowie No. 2 Mine (C1996083) Permit Renewal No. 3 Page 107 of 291 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 626.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />min <br />1 <br />750.00 <br />10.00 <br />3.00 <br />13.00 <br />678 <br />1.135 <br />Haul Time: 1.135 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 626.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />min <br />1 <br />750.00 <br />-10.00 <br />3.00 <br />-7.00 <br />3512 <br />0.267 <br />minutes <br />minutes <br />498.74 LCY/Hour <br />313.10 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 141.47 Hours <br />Unit cost: $1.322 /LCY Total job cost: $93,305.99 <br />CIRCES Cost Estimating Software <br />Return Time: 0.267 <br />Total Truck Cycle Time: 6.722 <br />Loading Tool unit <br />Production 600.89 <br />LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />377.23 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 2 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 626.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />JOB TIME AND COST <br />minutes <br />minutes <br />498.74 LCY/Hour <br />313.10 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 141.47 Hours <br />Unit cost: $1.322 /LCY Total job cost: $93,305.99 <br />CIRCES Cost Estimating Software <br />