My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-20_REVISION - C1996083 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-11-20_REVISION - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:44 PM
Creation date
11/21/2012 8:26:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/20/2012
Doc Name
Email Regarding Cost Estimate Review Part (2 of 2)
From
Susan Burgmaier
To
Brock Bowles
Type & Sequence
RN3
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine (C1996083) Permit Renewal No. 3 Page 107 of 291 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 626.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />min <br />1 <br />750.00 <br />10.00 <br />3.00 <br />13.00 <br />678 <br />1.135 <br />Haul Time: 1.135 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 626.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />min <br />1 <br />750.00 <br />-10.00 <br />3.00 <br />-7.00 <br />3512 <br />0.267 <br />minutes <br />minutes <br />498.74 LCY/Hour <br />313.10 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 141.47 Hours <br />Unit cost: $1.322 /LCY Total job cost: $93,305.99 <br />CIRCES Cost Estimating Software <br />Return Time: 0.267 <br />Total Truck Cycle Time: 6.722 <br />Loading Tool unit <br />Production 600.89 <br />LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />377.23 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 2 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 626.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />JOB TIME AND COST <br />minutes <br />minutes <br />498.74 LCY/Hour <br />313.10 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 141.47 Hours <br />Unit cost: $1.322 /LCY Total job cost: $93,305.99 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.