Laserfiche WebLink
Bowie No. 2 Mine (C 1996083) Permit Renewal No. 3 <br />Truck Bed (volume) Basis: <br />Truck <br />Loader <br />Struck Volume: <br />35.00 <br />LCY <br />Heaped Volume: <br />46.50 <br />LCY <br />Average Volume: <br />40.75 <br />LCY <br />Adjusted Volume: <br />42.25 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: <br />Loading Tool Capacity <br />Page 106 of 291 <br />42.26 LCY <br />Bucket Size Class: Large <br />Rated Capacity: 6.900 LCY (heaped) <br />Bucket Fill Factor: 0.875 Loose material - 1" and over (85 - 90 %) 0.875 <br />Adjusted Capacity: 6.038 LCY <br />Job Condition Corrections: Site Altitude (ft.): 6900 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck <br />Machine Cycle Time vs. Job Condition Rating: SEVERE <br />Selected Value within this Basic Rating: SEVERE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.10( <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />7 passes <br />NA minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj : <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck <br />Machine Cycle Time vs. Job Condition Rating: SEVERE <br />Selected Value within this Basic Rating: SEVERE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.10( <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />7 passes <br />NA minutes <br />Cycle Time Factors <br />NA <br />Factor (min.) <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB) <br />Stockpile: <br />NA <br />NA <br />(Cat HB) <br />Truck Ownership: <br />NA <br />NA <br />(Cat HB) <br />Operation: <br />I NA <br />I NA <br />I (Cat HB) <br />Dump Target: <br />I NA <br />I NA <br />I (Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: 0.70 <br />Truck Load Time: 3.520 <br />Truck Maneuver and Dump Time: 1.10 <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Net Cycle Time Adjustment: <br />NA <br />minutes <br />Adjusted Loader Cycle Time: <br />0.570 <br />minutes <br />Net Load Time per Truck: <br />3.520 <br />minutes <br />Minutes Adjusted for site altitude: 0.700 Minutes <br />Minutes Adjusted for site altitude: 3.520 Minutes <br />Minutes Adjusted for site altitude: 1.100 Minutes <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />CIRCES Cost Estimating Software <br />