My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-20_REVISION - C1996083 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-11-20_REVISION - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:44 PM
Creation date
11/21/2012 8:26:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/20/2012
Doc Name
Email Regarding Cost Estimate Review Part (2 of 2)
From
Susan Burgmaier
To
Brock Bowles
Type & Sequence
RN3
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine (C 1996083) Permit Renewal No. 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Pull Back/Haul Fill Mat'l from Upper Haul Rd 1 <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 <br />PROJECT IDENTIFICATION <br />Task #: 075 State: Colorado <br />Date: 6/15/2012 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />ipti <br />Truck Loader Team - Truck: Cat 773F <br />- Loader: Cat 365C L 13' -7" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Page 105 of 291 <br />Permit /Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -075 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $659.54 <br />MATERIAL OUANTITIES <br />Initial volume: 60,564 CCY Swell factor: 1.165 <br />Loose volume: 70,557 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pavload (weight) Basis: <br />Material weight: 2,900 <br />Description: Decomf <br />Rated Payload: 122,520 <br />Payload Capacity: 42.25 <br />Pounds/LCY <br />rock - 50% Rock, 50% Earth <br />Pounds <br />LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$62.45 <br />$79.34 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$117.76 <br />$136.53 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$22.29 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$202.50 <br />$254.54 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $659.54 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $659.54 <br />MATERIAL OUANTITIES <br />Initial volume: 60,564 CCY Swell factor: 1.165 <br />Loose volume: 70,557 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pavload (weight) Basis: <br />Material weight: 2,900 <br />Description: Decomf <br />Rated Payload: 122,520 <br />Payload Capacity: 42.25 <br />Pounds/LCY <br />rock - 50% Rock, 50% Earth <br />Pounds <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.