My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-20_REVISION - C1996083 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-11-20_REVISION - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:44 PM
Creation date
11/21/2012 8:26:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/20/2012
Doc Name
Email Regarding Cost Estimate Review Part (2 of 2)
From
Susan Burgmaier
To
Brock Bowles
Type & Sequence
RN3
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine (C1996083) Permit Renewal No. 3 Page 108 of 291 <br />Task description: <br />Site: Bowie No. 2 Mine <br />BULLDOZER WORK <br />Narrowed Section of Haul Road <br />Permit Action: Permit Renewal 3 <br />PROJECT IDENTIFICATION <br />Task #: 076 State <br />Date: 6/15/2012 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQi <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />APMENT COST <br />Cat D10T - lOSU <br />574 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -076 <br />Total unit Cost/Hour: $322.48 <br />Total Fleet Cost/Hour: $1,289.92 <br />MATERIAL QUANTITIES <br />Initial Volume: 60,564 <br />Swell factor: 1.165 <br />Loose volume: 70,557 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 75 feet <br />Unadjusted hourly 2,105.3 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 5% <br />Average site altitude: 6,500 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$102.22 <br />NA <br />Operating Cost/Hour: <br />$181.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $322.48 <br />Total Fleet Cost/Hour: $1,289.92 <br />MATERIAL QUANTITIES <br />Initial Volume: 60,564 <br />Swell factor: 1.165 <br />Loose volume: 70,557 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 75 feet <br />Unadjusted hourly 2,105.3 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 5% <br />Average site altitude: 6,500 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.