Laserfiche WebLink
093 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />101 <br />102 <br />110 <br />111 <br />112 <br />113 <br />114 <br />115 <br />116 <br />117 <br />118 <br />119 <br />120 <br />121 <br />122 <br />123 <br />124 <br />125 <br />126 <br />127 <br />128 <br />129 <br />130 <br />131 <br />140 <br />141 <br />142 <br />150 <br />151 <br />152 <br />153 <br />154 <br />Finish Grade Gob Pile #2 <br />GRADER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />16.37 <br />$2,200.00 <br />$2,532.42 <br />$3,856.48 <br />$2,717.76 <br />$3,609.83 <br />$6,738.36 <br />$506.10 <br />$321.00 <br />$35,040.73 <br />$357,393.86 <br />$23,291.13 <br />$21,901.60 <br />$48,021.83 <br />$1,238.18 <br />$7,185.31 <br />$1,313.28 <br />$1,562.52 <br />$1,050.44 <br />$36,328.64 <br />$48,132.00 <br />$12,276.97 <br />$243.42 <br />$15,787.40 <br />$53,786.72 <br />$72,685.45 <br />$222.28 <br />$937.51 <br />$2,746.45 <br />$7,228.87 <br />$149.43 <br />$981.98 <br />$237,039.17 <br />$99,247.45 <br />$719,943.98 <br />$477,456.55 <br />$44,074.31 <br />$50,632.08 <br />$33,725.20 <br />$120,116.62 <br />Backfill and Regrade Pond B <br />DOZER <br />7.63 <br />Backfill and Regrade Pond C <br />DOZER <br />11.61 <br />Backfill and Regrade Gob Pile Pond <br />DOZER <br />8.18 <br />Backfill and Regrade Pond F <br />DOZER <br />10.87 <br />Backfill and Regrade Pond J <br />DOZER <br />20.29 <br />Backfill and Regrade Pond K <br />DOZER <br />1.52 <br />Excavate for Post - mining Channel at B -Seam <br />Portals <br />EXCAVATE <br />0.63 <br />Install Riprap, Gravel, and geotextile in BSeam <br />Channel <br />NA <br />72.59 <br />Replace Topsoil from Stockpile A to Portal/Utility <br />Bench <br />SCRAPERI <br />652.39 <br />Replace Topsoil from Stockpile A to Truck <br />Loadout /Coal Stkpl <br />SCRAPERI <br />42.52 <br />Replace Topsoil from Stockpile F to Train Loadout <br />SCRAPERI <br />39.98 <br />Replace Topsoil from Stockpile A to B -Seam <br />Portal Bench <br />SCRAPERI <br />87.66 <br />Replace Topsoil fm Stockpile to Freeman Gulch <br />Vent Shaft Pad <br />DOZER <br />0.93 <br />Replace Topsoil fm Stockpiles C/D to Pond C and <br />Gob Pond <br />SCRAPERI <br />13.12 <br />Replace topsoil from Stockpile to Pond F <br />DOZER <br />3.95 <br />Replace topsoil from Stockpile F to Pond J <br />SCRAPERI <br />2.85 <br />Replace topsoil from Stockpile F to Pond K <br />SCRAPERI <br />1.92 <br />Replace topsoil fm stockpile to MR/TR Light -Use <br />Roads <br />DOZER <br />27.35 <br />Replace topsoil from stockpiles to MR/TR drill <br />pads <br />DOZER <br />36.23 <br />Replace topsoil from Stockpile A to Prep Plant <br />Bench <br />SCRAPERI <br />22.41 <br />Replace topsoil from stockpile to Material Storage <br />Area <br />DOZER <br />0.18 <br />Replace topsoil from Stockpile E to Gob Pile #2 <br />SCRAPERI <br />28.82 <br />Replace Topsoil from Stockpile to Gob Pile #2 <br />SCRAPERI <br />98.18 <br />Replace topsoil from stockpile to Gob Pile #3 <br />SCRAPERI <br />132.68 <br />Replace topsoil from stockpile to Haul Road <br />DOZER <br />0.17 <br />Replace topsoil from stockpile to Water Tank <br />Bench <br />SCRAPERI <br />1.71 <br />Replace topsoil from Stockpile G to TR35 <br />road /pad <br />SCRAPERI <br />5.01 <br />Replace topsoil from stockpile to Borrow Area <br />DOZER <br />5.44 <br />Replace topsoil fm stockpile to Upper Parking Lot <br />Expansion <br />DOZER <br />0.46 <br />Replace topsoil fm stockpile to Hubbard Ck Vent <br />Shaft Pad <br />DOZER <br />0.74 <br />Seal Portals and Shafts <br />MINESEAL <br />40.00 <br />Concrete Plug and Backfill Vent Shaft <br />NA <br />40.00 <br />Plug /Seal Boreholes <br />BOREHOLE <br />1,502.00 <br />Drill Seed Mix 3 on Disturbed Area <br />REVEGE <br />4.00 <br />Drill Seed Drill Pads <br />REVEGE <br />60.00 <br />Drill Seed Lt -Use Roads to Drill Pads and Terror <br />Creek <br />REVEGE <br />65.00 <br />Broadcast Seed Mix 3 on Gob Pile #2 <br />REVEGE <br />0.00 <br />Broadcast Seed Mix 3 on Gob Pile #3 <br />REVEGE <br />0.00 <br />