155
<br />156
<br />157
<br />165
<br />170
<br />171
<br />172
<br />173
<br />174
<br />180
<br />181
<br />182
<br />183
<br />201
<br />241
<br />242
<br />252
<br />253
<br />254
<br />255
<br />256
<br />257
<br />261
<br />278
<br />279
<br />280
<br />281
<br />282
<br />283
<br />284
<br />285
<br />286
<br />287
<br />288
<br />289
<br />290
<br />299
<br />300
<br />301
<br />302
<br />Drill seed Hubbard Creek Vent Shaft Pad
<br />REVEGE
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />0.00
<br />$1,407.75
<br />$234.63
<br />$87,395.02
<br />$1,689,821.87
<br />$689.85
<br />$125,910.40
<br />$152,324.00
<br />$238,780.80
<br />$108,630.65
<br />$47,027.41
<br />$47,027.41
<br />$4,594.67
<br />$30,046.38
<br />$55,026.30
<br />$7,479.06
<br />$5,647.46
<br />$1,385.99
<br />$5,898.54
<br />$405.35
<br />$2,673.65
<br />$1,074.02
<br />$4,041.41
<br />$153,879.48
<br />$8,658.36
<br />$78,673.61
<br />$29,412.03
<br />$22,329.54
<br />$24,631.37
<br />$18,699.90
<br />$11,403.62
<br />$1,635.26
<br />$915.88
<br />$654.06
<br />$268.22
<br />$1,079.28
<br />$340.21
<br />$6,255.59
<br />$13,641.26
<br />$457.52
<br />$1,020.25
<br />Drill Seed Rock Laydown Area
<br />REVEGE
<br />0.00
<br />Weed Control Over 10 -Year Liabilitv Period
<br />REVEGE
<br />0.00
<br />Demolish and Remove all Structures
<br />DEMOLISH
<br />80.00
<br />Proctor Testing of Backfill
<br />NA
<br />10.00
<br />Nuclear Density Testing of Backfill
<br />NA
<br />1,760.00
<br />Water Truck for Moisture Augmentation of
<br />Backfill Material
<br />MISCTRUK
<br />1,437.02
<br />Site Maintenance - Ten Years
<br />SITEMAINT
<br />ENANCE
<br />292.00
<br />Support Equipment for Scraper Hauling
<br />SITEMAINT
<br />ENANCE
<br />449.16
<br />Mobilize/Demobilize Equipment for First
<br />Construction Season
<br />MOBILIZE
<br />12.00
<br />Mobilize/Demobilize Equipment for Second
<br />Construction Season
<br />MOBILIZE
<br />12.00
<br />Mobilize/Demoblize Equipment for Pond Removal
<br />MOBILIZE
<br />6.50
<br />Mobilize/Demobilize Equipment for Yearly Site
<br />Maintenance
<br />MOBILIZE
<br />14.00
<br />Replace additional subsoil from Stockpile to Gob
<br />Piles
<br />SCRAPERI
<br />100.45
<br />Regrade Terror Creek Light -Use Road
<br />DOZER
<br />29.73
<br />Replace Topsoil from Stockpile to Terror Creek
<br />Lt -Use Road
<br />DOZER
<br />22.45
<br />Regrade BRL- 1- 03 -01, 1- 08 -01, and 1 -08 -04 pads
<br />DOZER
<br />5.51
<br />Regrade Light -Use Roads BRL- 1- 03 -01, - 08 -01,
<br />and -08 -04
<br />DOZER
<br />23.45
<br />Replace topsoil on BRL- 1- 03 -01, - 08 -01, and -08-
<br />04 pads
<br />DOZER
<br />1.61
<br />Replace topsoil on LU Roads to BRL- 1- 03 -01, -
<br />08 -01, & -08 -04
<br />DOZER
<br />10.63
<br />Reseed BRL- 1- 03 -01, - 08 -01, and -08 -04 pads
<br />REVEGE
<br />4.00
<br />Reseed BRL- 1- 03 -01, - 08 -01, and -08 -04 LU roads
<br />REVEGE
<br />16.00
<br />Concrete plug and backfill Terror Creek vent shaft
<br />NA
<br />40.00
<br />Access Road Topsoil (9.08 acres - TR73)
<br />DOZER
<br />43.32
<br />Plug and seal 13 boreholes TR -73
<br />BOREHOLE
<br />156.00
<br />Reseed Drill Pads (13 pads - TR -73)
<br />REVEGE
<br />23.92
<br />Reseed Access Roads - TR -73
<br />REVEGE
<br />18.16
<br />Drill Pad backfill (13 pads TR -73)
<br />DOZER
<br />123.24
<br />Access Road Regrading (9.08 acres - TR73)
<br />DOZER
<br />93.57
<br />Drill Pad Topsoil (13 pads - TR73)
<br />DOZER
<br />57.06
<br />Regrade GVB -B13F Drill Pad
<br />DOZER
<br />6.50
<br />Regrade Light -Use Road to GVB -B 13F
<br />DOZER
<br />3.64
<br />Replace Topsoil from Stockpile to GVB -B 13F pad
<br />DOZER
<br />2.60
<br />Replace Topsoil from Stockpile to GVB -B 13F
<br />Light -Use Road
<br />DOZER
<br />1.07
<br />Reseed GVB -B13F Drill Pad
<br />REVEGE
<br />11.02
<br />Reseed Light -Use Road to GVB -B 13F
<br />REVEGE
<br />0.20
<br />Plug and Seal GVB -B13F
<br />BOREHOLE
<br />48.00
<br />Plug and Seal 4 Utility Holes at Fan Bench
<br />BOREHOLE
<br />48.00
<br />Reseed Add'1 Disturbance from Utility Boreholes
<br />at Fan Bench
<br />REVEGE
<br />0.20
<br />Regrade Fan Bench - Utility Borehole Mudpit
<br />Add'1 Dist.
<br />DOZER
<br />4.06
<br />
|