The gas line was relocated by Ames and Colorado Natural Gas in order to continue slope <br />contouring in the area of the existing gas line. <br />C) Slope Contouring <br />Slope contouring was performed using various CAT dozers. Material generated during slope <br />contouring was placed as overburden fill at the top of the slope. <br />D) Soil Liner Fill (SLF) <br />Processing of Soil Liner Fill material continued at the East Cresson Clay Processing area. A CAT <br />D -8 dozer, a Hitachi 200 excavator, and a CAT 980 front -end loader were used to process the <br />material. The processed material was hauled from the East Cresson Clay Processing area to a <br />temporary stockpile designated by CC &V. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />E.Cresson Clay Process <br />9,589 <br />75,362 <br />DCF processing is temporarily paused <br />Total <br />9,589 <br />75,362 <br />DCF processing is temporarily paused <br />E) Drain Cover Fill (DCF) <br />No work performed during the week. <br />Location <br />This Week <br />Cumulative <br />Comments <br />DCF Process <br />- <br />158,613 <br />DCF processing is temporarily paused <br />Total <br />- <br />158,613 <br />DCF processing is temporarily paused <br />F) Miscellaneous <br />No work performed during the week. <br />II) Underground Mine Workings <br />A) Discovery <br />No work performed during the week. <br />B) Drilling <br />No work performed during the week. <br />C) Remediation <br />No work performed during the week. <br />III) Geosynthetics <br />A) Geomembrane Delivery <br />No work performed during the week. <br />B) Geomembrane Installation <br />No work performed during the week. <br />MEW Weekly Report WE 09.01.2012 <br />