My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-05_REVISION - C1982056 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2012-11-05_REVISION - C1982056 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:19 PM
Creation date
11/13/2012 2:37:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
11/5/2012
Doc Name
Letter & Application
From
Twentymile Coal Company
To
DRMS
Type & Sequence
SL1
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 12, 2011 <br />C- 1982- 056!Foidel Creek Mine <br />JDM <br />6NM Sediment Pond Embankment Erosion <br />All spillways were functioning as designed with no problems noted. <br />Ditches and culverts throughout the mine site were functioning as designed. No problems were noted with the <br />exception of the following: <br />- The sump located south of the railroad tracks and south of Pond B has neared capacity in terms of sediment. <br />This sump should be cleaned when dryer conditions dictate to ensure adequate freeboard is maintained. <br />-The culvert at the intersection of the explosives area access road was damaged at the inlet. <br />-The culvert Located to the north of the ROM stockpile and behind the vent fan is 34 full of sediment at the inlet. <br />-The disturbance associated with the stability work located approximately halfway between the collection ditch on <br />the east side of the railway between the batch weigh loadout and the 24" culvert under the railway next to the <br />conveyor has generated erosional gullies and runoff into the collection ditch. This area needs to be repaired with <br />proper sediment control in place in the collection ditch and at the culvert. <br />-The material stockpile generated from the stability repair work will require the placement of sediment control <br />structures around the stockpile. <br />Please address these maintenance items on or before October 1, 2011. <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.