Laserfiche WebLink
September 12, 2011 <br />Number of Partial Inspection this Fiscal Year. 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br />C -1982- 056 /Foidel Creek Mine <br />Page4of8 <br />JDM <br />GENERAL MINE PLAN COMPLANCE: <br />The longwall miner continues to operate in the 17LT panel. A coal train was m the process of loading at the time <br />of the inspection. <br />TCC received and acknowledged receipt of NOV- 2011 -005 on Monday September 12, 2011 during the inspection <br />of the site. <br />OTHER (SPECIFY). <br />This was a complete coal inspection of the Foidel Creek Mine conducted by Jason Musick of CDRMS. Brian <br />Watterson of TCC accompanied the inspection. The weather was clear and the ground was dry during the <br />inspection. <br />PROCESSING WASTE /COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization: Placement: <br />Refuse material continues to be placed in the RDA expansion area. Material has been stockpiled at the toe of the <br />RDA expansion area with grading being conducted during the inspection. The RDA was well compacted and <br />stable at the time of the inspection. <br />